Permit Information
Permit NumberBLD17-04316
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7805 W GRATZ DR
Project NameLyle Pearson 2nd Flr Addition
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON JAGUAR/LAND ROVER/VOLVO - 2ND FLOOR ADDITION) **This building is fire sprinklered for area increase. Permit to add 447 sq ft of new second floor within the existing building footprint for offices and to remodel the existing second floor office area. Work to include: new structure for the second floor addition; new ceiling on first and second floors; new interior non-bearing partition walls; new doors; new interior relites; new electrical; new mechanical; new finishes to be in compliance with Ch. 8 of the 2012 IBC. Certificate of Occupancy issued only for new second floor addition; see BLD03-01135 for Certificate of Occupancy for rest of building. Special inspections are required per the attached Form 310. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Approval is contingent upon adhering to the approved plans on file and attached engineering. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/201912/9/201912/9/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton
DOC - Permit Finaled12/9/201912/9/201912/9/2019PPASS
DetailsMike Jordan
BLD-Final10/22/201810/22/201810/22/2018PPEND
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. Needs special inspection final letter.
FIRE-Final Inspection10/18/201810/19/201810/19/2018APASS
DetailsTroy Cobbley
life safety passed


Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection10/17/201810/18/201810/18/2018APART
DetailsTroy Cobbley
Life safety complete for the second floor. All emergency lights and exit signs have been repaired. Can't final the permit until the sprinkler permit is complete which is providing sprinkler protection at the ground level, at the stairs.

Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection9/26/20189/28/20189/28/2018PFAIL
DetailsTroy Cobbley
Inspection was for the second floor. Need all exit signs and emergency lights for the entire facility repaired and the fire extinguishers provided with annual inspection.

Please call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection9/26/20189/26/20189/26/2018PCANC
DetailsTroy Cobbley
Call me when you head this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Framing/Rough-in6/29/20186/29/20186/29/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. @nd. floor interior steel stud framed walls ok.
BLD-Footing5/1/20185/2/20185/2/2018APASS
DetailsMike Jordan
We have concrete scheduled for 10 AM Phone #: ###-#### Inspection requested via web by Bob Thornton. Interior column pad footing for new column at mezz. addition.