Permit Information
Permit NumberBLD17-04596
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 800 E PARK BLVD Unit: 720
Project NameSt. Lukes WGPA - Suite #720
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGP4 – MK PLAZA IV BUILDING - 7TH FLOOR SUITE #720) (NOTE: DEFERRED SUBMITTALS TO ALLOW THE DOWNGRADE OF THE EXISTING 1-HR RATED CORRIDOR, THE ENTIRE 7TH FLOOR FIRE SPRINKLERS HEADS SHALL BE UPGRADED TO QUICK RESPONSE HEADS (SEE ATTACHED LETTER) – DO NOT FINAL UNTIL A SEPARATE FIRE SPRINKER PERMIT TO REPLACE THE SPRINKLERS HEADS TO QUICK RESPONSE FOR THE ENTIRE 7TH FLOOR HAVE BEEN REVIEWED AND APPROVED BY THE FIRE REVIEW DEPT.) Fire sprinklers used to meet high-rise provisions. Permit is to remodel an existing 26,770 sq. ft. business space within the 7th floor of the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, construction of interior non-bearing walls to create offices, a storage room, (2) wellness rooms, a IHT comm. room, and an accessible women’s restroom, select new door/door frames, millwork, select new gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/4/201810/5/201810/5/2018APASS
DetailsDave Hannah
zack Phone #: ###-####
FIRE-Final Inspection10/3/201810/4/201810/4/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

zack Phone #: ###-####
BLD-Ceiling Grid Inspection9/24/20189/25/20189/25/2018APASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Final9/7/20189/10/20189/10/2018APART
DetailsDave Hannah
Zack Phone #: ###-#### phase one ok
FIRE-Final Inspection9/7/20189/7/20189/7/2018PPART
DetailsJim Page
Project is being worked in phases, fire sprinklers complete for phase 2 (West side of level 7), fire alarms complete for phase 2, fire extinguisher are placed with current inspection tags, final life fire safety inspection for phase 2 west side complete, west side to be inspected at a later date.

Zack Phone #: ###-####
BLD-Framing/Rough-in8/30/20188/31/20188/31/2018APART
DetailsTony Young
rocky Phone #: ###-####,, walls ok pending trades
BLD-Final8/17/20188/20/20188/20/2018PPART
DetailsDave Hannah
partial pednding MEC & PLM - Zack Phone #: ###-#### phase 1 ok to occ
BLD-Ceiling Grid Inspection8/10/20188/13/20188/13/2018APASS
DetailsDave Hannah
Zack Phone #: ###-####
FIRE-Final Inspection8/10/20188/10/20188/10/2018PPART
DetailsJim Page
Project is being worked in phases, fire sprinklers complete for phase 1 (East side of level 7), fire alarms complete for phase 1, fire extinguisher are placed with current inspection tags, final life fire safety inspection for phase 1 east side complete, west side to be inspected at a later date.

Final life safety // Zac Phone #: ###-####
BLD-Ceiling Grid Inspection8/3/20188/3/20188/3/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Framing/Rough-in8/2/20188/3/20188/3/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Framing/Rough-in5/7/20185/8/20185/8/2018APART
DetailsDave Hannah
Ken Phone #: ###-####k to cover first phase
BLD-Framing/Rough-in5/7/20185/7/20185/7/2018PNR
DetailsTony Young
Ken Phone #: ###-####