BLD-Final | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Dave Hannah
|
|
|
Please call upon arrival and I can get you to the floors for inspection. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Final | 8/2/2018 | 8/2/2018 | 8/3/2018 | P | PEND |
Dave Hannah
|
|
|
Please call upon arrival Inspection is slated for 2nd Floor. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald ok for temp occ needs to install doors and windows and get other trades to perm
|
FIRE-Final Inspection | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
Please Call upon Arrival for Access to 2nd Floor, I am available at all times at this address, Thank You, Ron Oswald Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Ceiling Grid Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Dave Hannah
|
|
|
Please call upon arrival to get up to Floor 2 for inspection, all MEP inspections completed. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Final | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Dave Hannah
|
|
|
Please call upon arrival, Note this inspection is for 3rd floor TCO. I believe all pre inspections are now completed, to be sure I am speaking with all subs to verify. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald ok for temp occ on 3rd floor
|
BLD-Other | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | NR |
Dave Hannah
|
|
|
Inspection for TCO on 3rd floor, please call upon arrival for access. Thank You Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Conference | 5/31/2018 | 5/31/2018 | 6/1/2018 | P | PASS |
Dave Hannah
|
|
|
Please call for access, For review of requirements to receive TCO at 3rd floor building area, Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Ceiling Grid Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Dave Hannah
|
|
|
Please call for access at anytime,3rd floor ceiling Grid Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Framing/Rough-in | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Jim Storey
|
|
|
Rough Framing inspection for 2nd floor , Please call upon arrival for access. Ron Oswald ###-#### Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Framing/Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Dave Hannah
|
|
|
Please contact either Ron Oswald or Zach Cooper to accommodate access to Third floor area for inspection. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|