Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-01173
StatusFinaled
Name CBH HOMES
Site Address 3083 S LINDA VISTA PL
Project NameMonterey 7-1 Diamante
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 2,100 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 136 sq. ft. of covered patio/porch and a 673 sq. ft. attached garage per the approved plans and any notations. R-1A zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/12/201811/13/201811/13/2018APASS
DetailsMike Jordan
Door code is 2468, Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled11/13/201811/13/201811/13/2018PPASS
DetailsMike Jordan
All issues resloved.
BLD-Final11/7/201811/8/201811/8/2018AFAIL
DetailsMike Jordan
Door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Handrail in back still non code compliant. Must terminate at newel above nosing at lowest riser., it does not.
BLD-Final10/8/201810/8/201810/8/2018PFAIL
DetailsMike Jordan
door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide final for fireplace. Provide blower door test report and post results. Provide code compliant handrail at back door. Correction notice posted.
BLD-Final9/26/20189/27/20189/27/2018ANR
DetailsMike Jordan
Door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs all MEP's finals first.
BLD-Energy code compliance8/9/20188/9/20188/9/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in8/9/20188/9/20188/9/2018PPASS
DetailsMike Jordan
thank you for your patience. Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in8/8/20188/8/20188/8/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs to remove all sheetrock and insulation for framing inspection.
BLD-Framing/Rough-in8/7/20188/7/20188/7/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Mech. rough in inspection has failed.
BLD-Framing/Rough-in8/3/20188/6/20188/6/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. rough in inspection.
BLD-Framing/Rough-in7/27/20188/2/20188/2/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs electrical and mech. rough in inspections.
BLD-Wall Bracing7/25/20187/25/20187/25/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation6/27/20186/27/20186/27/2018PPASS
DetailsMike Jordan
Dane Phone #: ###-####
DOC - Permit Finaled6/27/20186/27/20186/27/2018PPASS
DetailsMike Jordan
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Foundation6/25/20186/26/20186/26/2018PNR
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing6/22/20186/25/20186/25/2018PPART
DetailsMike Jordan
Dane Phone #: ###-####