Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-01211
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 4521 E LOGGER DR
Project NamePalouse 2 Story Sun Valley
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2515 sq. ft., two story (first story 1105 sq. ft., second story 1410 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 93 sq. ft. of covered patio/porch and a 483 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20191/3/20191/3/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
DOC - Permit Finaled1/3/20191/3/20191/3/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results1/2/20191/3/20191/3/2019PDONE
DetailsBrandon Shaw
ACH50- 3.19
BLD-Final1/2/20191/2/20191/2/2019PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Blower Door Test Results1/2/20191/2/20191/2/2019PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Framing/Rough-in10/22/201810/23/201810/23/2018APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in10/22/201810/22/201810/22/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kyle Seick. Framing repairs not completed.
BLD-Framing/Rough-in10/18/201810/19/201810/19/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Energy code compliance10/18/201810/19/201810/19/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other10/17/201810/17/201810/17/2018PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in10/16/201810/16/201810/16/2018PFAIL
DetailsBrandon Shaw
Anchor bolts to be no more than 12" from ends of sill plate...
Hold downs and straps to be as per plans and installed be Man. Rec...
Per plan note #11, A34 framing anchors required for second story drag truss at interior shear wall...

OK to insulate
BLD-Framing/Rough-in10/11/201810/15/201810/15/2018PCANC
DetailsBrandon Shaw
Last one of the day if possible? Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Framing/Rough-in10/11/201810/11/201810/11/2018PCANC
DetailsBrandon Shaw
Last one of the day if possible? Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Foundation8/13/20188/13/20188/13/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing8/10/20188/10/20188/10/2018APASS
DetailsBrandon Shaw
Work in progress