Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-01261
StatusFinaled
Name BOISE CITY GOVERNMENT BUILDINGS
Site Address 825 S 17TH ST
Project NameFacilities Office
Customer Number 
ePlanReviewYes
Description
(FACILITIES OFFICE) //Plan modification to rename the building to “FACILITIES OFFICE”, added a new ice machine in break room and relocate the refrigerator and some plumbing work. 8-3-2018 JG// (CITY OF BOISE – GOVERNMENT BUILDING) Permit is to remodel an existing 1,838 sq. ft. business space within an existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal and replacement of select exterior window, removal of select nonbearing walls, removal of select door/door frames, removal of select millwork, removal of drinking fountain, removal of select plumbing fixture, construction of select interior non-bearing walls to create a break/conference room area, a hall, a mechanical/electrical room and an accessible restroom with an accessible shower, select new door/door frames, millwork, select interior window, select new plumbing fixtures, a new Hi/Lo drinking fountain, select new suspended acoustic and gypsum ceilings, relocate select light fixture, select new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/11/2019 DONE
per building final inspection on 2/13/2019 by David H
BLD-Final2/12/20192/13/20192/13/2019APASS
DetailsDave Hannah
Dale Phone #: ###-####
BLD-Final12/13/201812/14/201812/17/2018PPEND
DetailsDave Hannah
Dale Phone #: ###-#### ok for temp occ ok for perm occ ok for perm occ after plumbing gos perm
FIRE-Final Inspection12/13/201812/14/201812/14/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Dale Phone #: ###-####
BLD-Ceiling Grid Inspection12/10/201812/10/201812/10/2018PPASS
DetailsMike Jordan
Dale Phone #: ###-####
BLD-Framing/Rough-in10/29/201810/29/201810/30/2018PPASS
DetailsDave Hannah
Dale Phone #: ###-####