BLD-Blower Door Test Results | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Tony Young
|
|
|
Call for access- Steve Phone #: ###-####// 3.86
|
BLD-Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Tony Young
|
|
|
Call for access- Steve Phone #: ###-####
|
DOC - Permit Finaled | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PART |
Tony Young
|
|
|
Call for access- Steve Phone #: ###-####// needs the blower door test results,, vent wells on exterior or redo the landscape,, firecaulk t-stat wire
|
BLD-Conference | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Tony Young
|
|
|
frame corrections were made and verified at the energy code inspection
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | PART |
Tony Young
|
|
|
Steve Phone #: ###-####,, see paint notes,, ok to insulate
|
BLD-Wall Bracing | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jim Storey
|
|
|
shear- Steve Phone #: ###-####
|
BLD-Footing | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|