Permit Information
Permit NumberBLD18-01499
StatusIssued
Name YOST CONSTRUCTION
Site Address 10322 W STARDUST DR
Project NameMcKay Shop
Customer Number 
ePlanReviewNo
Description
FOR RESIDENTIAL USE ONLY. NAT AN ADU. FLOOR DRAINS ARE NOT PERMITTED IN MECH PIT AS THEY DO NOT SHOW IN PLANS. DRAINS MUST BE APPROVED BY PW. RMB 05-01-2018 Permit to construct a 2,275sq' shop. All work per plans, engineering, local codes & ordinances. Separate electrical & plumbing permits required. **JAB**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance1/23/20191/24/20191/24/2019APASS
DetailsJim Sly
Access off Franklin - Chad Phone #: ###-####
BLD-Energy code compliance11/21/201811/21/201811/21/2018PPASS
DetailsMike Jordan
Chad Phone #: ###-####
BLD-Other11/13/201811/13/201811/13/2018PCANC
DetailsMike Jordan
Chad-air seal Phone #: ###-####
BLD-Framing/Rough-in11/13/201811/13/201811/13/2018PPASS
DetailsMike Jordan
Chad-air seal Phone #: ###-####
BLD-Framing/Rough-in11/1/201811/1/201811/1/2018PFAIL
DetailsMike Jordan
Phone #: ###-####. Complete airseal pack. Provide non shrink grout under base plates.
BLD-Wall Bracing10/19/201810/19/201810/19/2018PDONE
DetailsDave Hannah
BLD-Framing/Rough-in10/19/201810/19/201810/19/2018PNR
DetailsDave Hannah
Tony Phone #: ###-#### needs trades
BLD-Wall Bracing10/19/201810/19/201810/19/2018PPASS
DetailsDave Hannah
BLD-Framing/Rough-in10/16/201810/17/201810/17/2018ACANC
DetailsMike Jordan
Tony Phone #: ###-####
BLD-Wall Bracing10/17/201810/17/201810/17/2018AFAIL
DetailsMike Jordan
Tony Phone #: ###-####. Still noted areas were fasteners are missing.
BLD-Framing/Rough-in10/15/201810/15/201810/15/2018PFAIL
DetailsMike Jordan
Tony Phone #: ###-####. Noted several areas were fasterners are missing or over spaced on SW 1 type shearwlls. Also noted over spaced fasteners on SW 2 type shearwalls. Also provide the 2 rows of fsteners on the sill plates at the required spacing as per the engineering. Correction notice posted.
BLD-Foundation7/27/20187/30/20187/30/2018APASS
DetailsMike Jordan
Please call ahead concrete comming at 3:30 // Doug Phone #: ###-####
BLD-Foundation7/26/20187/27/20187/27/2018ACANC
DetailsDave Hannah
Please call ahead concrete comming at 3:30 // Doug Phone #: ###-####
BLD-Footing7/23/20187/24/20187/24/2018APASS
DetailsBrandon Shaw
Please call ahead for access
Done by 9, pouring at 3 -Doug Phone #: ###-####
BLD-Footing7/19/20187/20/20187/20/2018PFAIL
DetailsMike Jordan
spoke about possibly being there at 1// Doug Phone #: ###-####. Missing rebar in pit. Needs geotech report for pit footing and interior footing.
BLD-Foundation7/3/20187/5/20187/5/2018APASS
DetailsJim Sly
Doug---rebar--prefer early morning, pouring concrete at 3pm Phone #: ###-####
BLD-Footing6/26/20186/27/20186/27/2018APASS
DetailsMike Jordan
Rick Phone #: ###-####. Perimeter footings ok.
BLD-Footing6/25/20186/25/20186/25/2018PNR
DetailsMike Jordan
Doug Phone #: ###-####-please call to meet
Extend Permit 90/180 days6/21/20186/25/20186/25/2018AFAIL
DetailsMike Jordan
Rick Phone #: ###-####. Several areas were rebar is on ground and less than 3 inches of clearance. Verts to be tied in place prior to placing concrete. Correction notice posted.
BLD-Footing6/21/20186/21/20186/21/2018PNR
DetailsDave Hannah
Rick Phone #: ###-####