Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-01730
StatusFinaled
Name HORIZON RETAIL CONSTRUCTION INC
Site Address 8321 W OVERLAND RD
Project NameAspen Dental Tenant Improvemen
Customer NumberBLD18-02629 EARLY START
ePlanReviewYes
Description
(ASPEN DENTAL TI) (BLD18-02629 Early Start) Permit to build out a new 3,500 sq. ft. dental office in a new shell space constructed under BLD18-01380. Note: site work and envelope including exterior lighting was approved with the shell permit. Work to include: interior concrete slab; non-bearing interior partition walls, door, and interior relites; millwork; two fully accessible restrooms; patient chair lift; electrical, interior lighting, mechanical, and plumbing; and interior finishes in compliance with Chapter 8 of the 2015 IBC. This building is NOT fire sprinklered. Approval is contingent upon adhering to the approved plans on file. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201811/16/201811/16/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Mark Becker
OK for Perm Occ.
FIRE-Final Inspection11/13/201811/15/201811/15/2018PPASS
DetailsTroy Cobbley
Life safety passed. Contractro agreed to provide ADA hardware on the pocket door and provide sticker at the main exit door with the keyed egress hardware.

Mark Phone #: ###-####
BLD-Ceiling Grid Inspection11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker
BLD-Ceiling Grid Inspection11/6/201811/8/201811/8/2018ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mark Becker Inspection cancelled from web by: Mark Becker
BLD-Ceiling Grid Inspection10/31/201810/31/201810/31/2018APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker. Draft stop ok. Needs MEP's sign off prior to installing tile and another grid inspction.
BLD-Wall cover10/12/201810/12/201810/12/2018APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker. Draft stop has been installled, but has several gaps. Will verify completion at grid inspection.
BLD-Framing/Rough-in10/4/201810/5/201810/5/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker. Interior steel studframed walls ok. No grid at this time. Pending electrical rough in inspection.
BLD-Framing/Rough-in9/18/20189/19/20189/19/2018ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker
BLD-Conference9/19/20189/19/20189/19/2018ADONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mark Becker
BLD-Framing/Rough-in9/18/20189/18/20189/18/2018PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mark Becker Inspection cancelled from web by: Mark Becker