BLD-Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Brandon Shaw
|
|
|
Chris - */Requesting Virtual Inspection*/ Phone #: ###-####
|
DOC - Permit Finaled | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 7/27/2020 | 7/27/2020 | 7/30/2020 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Final | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PEND |
Brandon Shaw
|
|
|
Temp Co of O is approved for basement and main house... Corrections to be completed before C of O is to be issued- hand rail to be continuous(up stairsflight) and garage door self closing hinge... Front entry strairs, hand and guard rails, PW approval for landscaping...
|
BLD-Aging Inspection | 4/20/2020 | 4/20/2020 | 4/20/2020 | | DEFR |
Brandon Shaw
|
|
|
See previous entry... emailed GC that TCO will expired on 5/22/2020. See DOCs
|
BLD-Aging Inspection | 2/17/2020 | 2/17/2020 | 2/18/2020 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Final | 12/18/2019 | 1/20/2020 | 1/21/2020 | A | DEFR |
Brandon Shaw
|
|
|
Temp C of O to be extended for 30 days, 22Feb2020...
|
BLD-Final | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O is ok for 30 days... 20Jan20 final has been scheduled, corrections- hand rail to be continuous(up stairsflight) and garage door self closing hinge... Front entry strairs, hand and guard rails to be installed before CofO is issued...
|
BLD-Final | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | CANC |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
BLD-Final | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | NR |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
FIRE-Final Inspection | 11/26/2019 | 11/27/2019 | 11/27/2019 | P | CANC |
Jim Page
|
|
|
As noted in permit details, no life fire safety signature required for this project, this request is cancelled.
chris Phone #: ###-####
|
BLD-Conference | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | DONE |
Brandon Shaw
|
|
|
No changes to the interior, no revisions needed... Submit Geo soil subgrade to PW for review and approval, deck post footing and Main enrty stairs... Submit revisions or Engineering approval for deck... Main enrty stairs to be revised and submitted for approval...
|
BLD-Energy code compliance | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, interior ok to insulate,, exterior not ready,, unfinished basement living area
|
BLD-Framing/Rough-in | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | NR |
Tony Young
|
|
|
Chris Phone #: ###-####,, extensive walk through only,, needs trades,, needs engineer to clarify some of the shear
|
BLD-Conference | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PEND |
Tony Young
|
|
|
verify scope of work (garage area),, plans show an unfinished basement area,, plan notes that ADU is NOT allowed
|
BLD-Conference | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | DEFR |
Tony Young
|
|
|
verify scope of work (garage area)
|
BLD-Foundation | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | NR |
Mike Jordan
|
|
|
wall- Chris Phone #: ###-####
|
BLD-Footing | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Dave Hannah
|
|
|
late morning .. pour at 3 // Chris Phone #: ###-####
|
BLD-Footing | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | NR |
Dave Hannah
|
|
|
late morning .. pour at 3 // Chris Phone #: ###-####
|