(MOSSMAN LAW OFFICE) // 12/18/19 PLAN MOD TO CHANGE MEZZANINE TO ATTIC AREA // 5/21/19 PLAN MOD FOR SPIRAL STAIR ENGINEERING DEFERRED SUBMITTAL // 3/18/19 PLAN MOD TO ADD 95 SQ FT MEZZANINE ABOVE OFFICE // 11/26/18 PLAN MOD TO DEMO AND REBUILD THE FULL FOUNDATION, POUR ADDITIONAL SLAB TO ADD OFFICE, AND ADD BEAMS TO SUPPORT ROOF AND FLOOR JOISTS. NEW OFFICE B106 CREATED, FIELD VERIFY MECHANICAL, LIGHTING NOT TO EXCEED 1.11 WATTS/SF, OCCUPANCY SENSOR REQUIRED. ENERGY COMCHECK FORMS DEFERRED FOR THIS OFFICE. JAR // **Permit for a remodel and addition to an existing 1,350 sq ft law office. This permit is approved contingent upon adhering to the approved plans on file. Work to include: interior and exterior demo, first floor addition, basement addition, remodeling existing basement for new use as office, new interior stair to basement, new exterior entrance with stairs and accessible ramp, new back patio, upgrades to existing restroom for accessible upgrades and new fully accessible restroom with shower, mechanical, electrical, and plumbing work, and interior finishes in compliance with Ch. 8 of the 2015 IBC. Special inspections required per the attached Form 310. This building is NOT fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/29/20205/29/20206/3/2020 PEND
DetailsTony Young
BLD-Aging Inspection5/28/20205/28/20205/29/2020 DONE
DetailsTony Young
BLD-Final1/14/20201/15/20201/15/2020PPASS
DetailsDave Hannah
call for access, Mark Phone #: ###-####
BLD-Final1/13/20201/14/20201/14/2020PPART
DetailsTony Young
call for access, Mark Phone #: ###-####,, needs zoning
FIRE-Final Inspection1/13/20201/14/20201/14/2020APASS
DetailsJim Page
Previously noted item has been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is compete, signature card not found at time of inspection.

call for access, Mark Phone #: ###-####
FIRE-Conference1/10/20201/10/20201/10/2020ADONE
DetailsJim Page
Allowed 1 double keyed deadbolt for building, recommend using wets door for employee entrance and leave signage that is in place. North door that was existing on door schedule was changed, due to newer door it has to meet IFC 2015 edition requirements listed under 1010.1.9.
FIRE-Final Inspection1/9/20201/10/20201/10/2020ACANC
DetailsJim Page
Request was for a conference, this request is cancelled.

call for access / Mark Phone #: ###-####
FIRE-Final Inspection12/20/201912/20/201912/20/2019PFAIL
DetailsJim Page
Provide code compliant door hardware on the north and the west exit dooes, both doors have thumbturn deadbolts, a double key deadbolt is allowed on the door that will be the main entry. Provide annual inspection for fire extinguishers as discussed.

call for access code // Mark Phone #: ###-####
BLD-Conference12/3/201912/4/201912/4/2019ADONE
DetailsJim Page
Fire conference is complete.

Mark -please if possible call prior Phone #: ###-####
BLD-Conference11/22/201911/25/201911/25/2019APART
DetailsTony Young
Call ahead // Mark Phone #: ###-####,, general ?s,, architect may revise plans and re-submit
BLD-Energy code compliance9/3/20199/3/20199/3/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Framing/Rough-in8/16/20198/19/20198/19/2019APASS
DetailsBrandon Shaw
call before coming- Mark Phone #: ###-####
BLD-Conference7/29/20197/30/20197/30/2019ADONE
DetailsDave Hannah
MARK Phone #: ###-####
BLD-Conference6/24/20196/24/20196/24/2019PPEND
DetailsTony Young
Mark- please call for access to meet at site Phone #: ###-####..?s on storage room/loft headroom
BLD-Wall Bracing6/5/20196/5/20196/5/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Foundation2/21/20192/22/20192/22/2019PPASS
DetailsTony Young
rebar for basement- Mike Phone #: ###-####,, upper section of masonary wall ok
BLD-Foundation1/31/20192/1/20192/1/2019APART
DetailsTony Young
Mike-this insp has nothing to do woithg the plan mod on permit Phone #: ###-####,, 1st 4' 8" of masonary wall,, 2 bond beams included
BLD-Footing1/14/20191/15/20191/15/2019APART
DetailsTony Young
Ready close to noon // James Phone #: ###-####,, work in progress,, ok,, will provide cold weather concrete provisions