BLD-Aging Inspection | 5/29/2020 | 5/29/2020 | 6/3/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/28/2020 | 5/28/2020 | 5/29/2020 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Dave Hannah
|
|
|
call for access, Mark Phone #: ###-####
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | P | PART |
Tony Young
|
|
|
call for access, Mark Phone #: ###-####,, needs zoning
|
FIRE-Final Inspection | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is compete, signature card not found at time of inspection.
call for access, Mark Phone #: ###-####
|
FIRE-Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Jim Page
|
|
|
Allowed 1 double keyed deadbolt for building, recommend using wets door for employee entrance and leave signage that is in place. North door that was existing on door schedule was changed, due to newer door it has to meet IFC 2015 edition requirements listed under 1010.1.9.
|
FIRE-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | CANC |
Jim Page
|
|
|
Request was for a conference, this request is cancelled.
call for access / Mark Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | FAIL |
Jim Page
|
|
|
Provide code compliant door hardware on the north and the west exit dooes, both doors have thumbturn deadbolts, a double key deadbolt is allowed on the door that will be the main entry. Provide annual inspection for fire extinguishers as discussed.
call for access code // Mark Phone #: ###-####
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete.
Mark -please if possible call prior Phone #: ###-####
|
BLD-Conference | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PART |
Tony Young
|
|
|
Call ahead // Mark Phone #: ###-####,, general ?s,, architect may revise plans and re-submit
|
BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Brandon Shaw
|
|
|
call before coming- Mark Phone #: ###-####
|
BLD-Conference | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | DONE |
Dave Hannah
|
|
|
MARK Phone #: ###-####
|
BLD-Conference | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PEND |
Tony Young
|
|
|
Mark- please call for access to meet at site Phone #: ###-####..?s on storage room/loft headroom
|
BLD-Wall Bracing | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Foundation | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Tony Young
|
|
|
rebar for basement- Mike Phone #: ###-####,, upper section of masonary wall ok
|
BLD-Foundation | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Tony Young
|
|
|
Mike-this insp has nothing to do woithg the plan mod on permit Phone #: ###-####,, 1st 4' 8" of masonary wall,, 2 bond beams included
|
BLD-Footing | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PART |
Tony Young
|
|
|
Ready close to noon // James Phone #: ###-####,, work in progress,, ok,, will provide cold weather concrete provisions
|