BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Sly
|
|
|
Dylan ###-#### I will make sure house is unlocked in the morning! Thanks Phone #: ###-#### Inspection requested via web by Dylan Schneider Blower Door 6.7
|
DOC - Permit Finaled | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/13/2019 | 3/14/2019 | 3/15/2019 | A | NR |
Jim Sly
|
|
|
DILLON Phone #: ###-####
|
BLD-Final | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | NR |
Jim Sly
|
|
|
Dillon Phone #: ###-####
|
BLD-Energy code compliance | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Dylan Phone #: ###-####
|
BLD-Framing/Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Jim Sly
|
|
|
call 30 mins ahead- Dillan Phone #: ###-####
|
BLD-Wall Bracing | 9/26/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Jim Sly
|
|
|
dillon 724 0248 call 1st
|
BLD-Wall Bracing | 9/26/2018 | 9/25/2018 | 9/26/2018 | A | CANC |
Jim Sly
|
|
|
call 15 mins ahead-Dyaln Phone #: ###-####
|
BLD-Wall Bracing | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | FAIL |
Mike Jordan
|
|
|
Shear // Dillon Phone #: ###-####. Install all missing blocking and nail. Rremove tyvek for wall bracing inspection. Correction notice posted.
|
BLD-Foundation | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Jim Sly
|
|
|
wall pour at 230// Dillon Phone #: ###-####
|
BLD-Footing | 7/2/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Jim Sly
|
|
|
Trying to pour footing at 1pm. Thanks Andy Phone #: ###-#### Inspection requested via web by Dylan Schneider
|