BLD-Blower Door Test Results | 12/12/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Tony Young
|
|
|
3283 code Phone #: ###-#### Inspection requested via web by David Wipper// 3.76
|
DOC - Permit Finaled | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Tony Young
|
|
|
3283 code Phone #: ###-#### Inspection requested via web by David Wipper// B D 3.76
|
BLD-Final | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PART |
Tony Young
|
|
|
3283 code Phone #: ###-#### Inspection requested via web by David Wipper,, ok just needs to verify public works hillside approval
|
BLD-Other | 10/3/2018 | 10/4/2018 | 10/8/2018 | A | DONE |
Tony Young
|
|
|
Sofit - Larry Phone #: ###-####
|
BLD-Other | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PART |
Jim Storey
|
|
|
sofit- Larry Phone #: ###-#### need fire rated listings for can lights.
|
BLD-Energy code compliance | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | PASS |
Dave Hannah
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PART |
Tony Young
|
|
|
Larry Phone #: ###-####,, see paint,, tighten all nuts in the sill plate bolts,, seal holes in the plates,, add hanger on upstairs hip ridge jack,, fire block the double wall top plates,, (can be insulation),, see paint,, will need one more tenting inspection from the sprinkler inspector prior to energy code passing for cover,, ok to insulate after fixes
|
BLD-Wall Bracing | 9/17/2018 | 9/18/2018 | 9/18/2018 | P | PART |
Tony Young
|
|
|
Shear wall re inspection Phone #: ###-#### Inspection requested via web by David Wipper,, exterior ok now
|
BLD-Wall Bracing | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Mike Jordan
|
|
|
Shear // Larry Phone #: ###-####. exterior shear nailing ok. Noted one simpson STHD 14 placed in wrong location in middle of lower window, soyth wall. Will need to have engineer provide alternate fix. Will verify on framing inspection.
|
BLD-Wall Bracing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | NR |
Dave Hannah
|
|
|
Shear // Larry Phone #: ###-####
|
BLD-Foundation | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | FAIL |
Brandon Shaw
|
|
|
Need subgrade approval
|
BLD-Footing | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs approval from the office 1st,,
|
BLD-Footing | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs soils
|