BLD-Final | 1/7/2020 | 1/28/2020 | 1/29/2020 | A | PASS |
Tell Riley
|
|
|
please call 1/2 hr ahead to meet // Nelson ###-####//corrections made//
|
DOC - Permit Finaled | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | DONE |
Tell Riley
|
|
|
3.63 ACH 50
|
BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 | P | PART |
Tell Riley
|
|
|
will call when ready....final ok--corrections made//Temp only, guard over window in bath until new tempered window is installed//will check back in one month//
|
BLD-Final | 1/3/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Tell Riley
|
|
|
for TCO - after 2pm // Farid//talked with Farid about putting up a guard over window that is not safety glazed for TCO//will call tomorrow when guard is installed//
|
BLD-Foundation | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Tell Riley
|
|
|
|
BLD-Conference | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | DONE |
Tell Riley
|
|
|
Nelson Phone #: ###-####//two windows above showers will not need to be tempered--above 5 ft of we surface//large window above tub will require to be tempered per the plans//
|
BLD-Final | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | FAIL |
Tell Riley
|
|
|
Nelson Phone #: ###-####//need blower door, tempered windows in bathrooms, add smoke co detector, install attic access in garage//CN posted//
|
BLD-Aging Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | DONE |
Tell Riley
|
|
|
Expires: 01/26/20
|
BLD-Other | 10/16/2019 | 10/21/2019 | 10/21/2019 | P | DONE |
Tell Riley
|
|
|
Status?//talked to contractor onsite--final finishes are being completed//anticipates final inspection in two weeks//
|
BLD-Aging Inspection | 7/30/2019 | 7/30/2019 | 7/30/2019 | | PASS |
Tell Riley
|
|
|
Expires: 09/14/19
|
BLD-Energy code compliance | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Mike Jordan
|
|
|
Nelson Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Jim Sly
|
|
|
Nelson Phone #: ###-####
|
BLD-Framing/Rough-in | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PART |
Jim Sly
|
|
|
Nelson Phone #: ###-#### Exterior shear nailing.......OK.
|
BLD-Foundation | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jim Sly
|
|
|
Francis Phone #: ###-####
|
BLD-Foundation | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | NR |
Mike Jordan
|
|
|
Wall // Francis Phone #: ###-####
|
BLD-Footing | 9/26/2018 | 9/27/2018 | 9/28/2018 | P | PASS |
Jim Sly
|
|
|
Francies Phone #: ###-####
|