Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-02293
StatusFinaled
Name GREEN TEAM CONSTRUCTION LLC
Site Address 1777 S CURTIS RD
Project NameHeritage Village
Customer Number 
ePlanReviewNo
Description
(HERITAGE VILLAGE - Fire repair) Permit for repairs to 4 units within an existing building as the result of fire damage with work to include the removal and replacement some electrical, wall finishes, plumbig fixtures and the repair of an individual truss per the attached engineering will be completed. All sleeping room separations and corridors are required to be maintained. A preconstruction meeting with the structural inspector is required prior to any work being completed. This is a scope of work permit with a certificate of completion to be issued upon approval and completion of the project. This building is fully fire sprinklered for area increase. Any alterations tothe sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/24/201810/25/201810/25/2018APASS
DetailsMike Jordan
will mitchell Phone #: ###-####
DOC - Permit Finaled10/25/201810/25/201810/25/2018PPASS
DetailsMike Jordan
FIRE-Final Inspection10/23/201810/24/201810/24/2018APASS
DetailsTroy Cobbley
Life safety passed

Will Phone #: ###-####
BLD-Final10/4/201810/5/201810/5/2018ANR
DetailsMike Jordan
Call half hour before to meet // Will Phone #: ###-####. Needs to resolve fire issues.
FIRE-Final Inspection10/4/201810/4/201810/4/2018PFAIL
DetailsTroy Cobbley
Not ready for final yet. Need canopies for sprinklers, smoke detectors uncovered, panic hardware on exit door, need FIR15-00124 finaled first. Also need the replaced smoke detector and horn/strobe tested.

Will Phone #: ###-####
BLD-Final9/27/20189/28/20189/28/2018ANR
DetailsMike Jordan
Please call ahead for access - Will Phone #: ###-####. Needs life/safety final first.
BLD-Energy code compliance7/16/20187/16/20187/16/2018PPASS
DetailsMike Jordan
call 20 minute before to meet // WIll Phone #: ###-####
BLD-Framing/Rough-in7/10/20187/10/20187/10/2018PPASS
DetailsMike Jordan
Call to meet // Will Phone #: ###-####. All issues were resolved.
BLD-Framing/Rough-in7/9/20187/9/20187/9/2018PFAIL
DetailsMike Jordan
Call 15 mins ahead- Will Phone #: ###-####. Truss repair not per the engineered fix.