Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD18-02498
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 777 W MAIN ST Unit: STE 500
Project NameClearwater - 5th Story
Customer Number 
ePlanReviewYes
Description
(CLEARWATER ANALYTICS – 5TH STORY) The fire sprinkler system is used for occupancy and for high-rise. To remodel the 26,147 square foot 5th story (19,790 square feet office areas, 3,298 square feet building core, and 3,059 square feet terrace) of an existing high rise building and to prepare it for occupancy. Within the 308 square foot Men’s toilet room, 2 urinals will be relocated, 1 urinal will be added, and 2 toilets will be added. Work is to include interior nonbearing walls, interior doors, interior windows, suspended acoustical ceilings, gypsum board ceilings and soffits, millwork, and finishes. The sink in the Mother’s Room is required to be accessible to the disabled with knee and toe clearance provided for a front approach. The sinks in the break rooms are required to be accessible to the disabled having a side approach (i.e. knee and toe clearance is not required). The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The core areas, existing work, and all high rise system are required to be maintained in compliance with the 2012 IBC. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/22/20191/23/20191/23/2019APASS
DetailsMike Jordan
Garret Phone #: ###-####. Per #415, electrical has signed perm. occ. ok for perm occ.
BLD-Final1/17/20191/18/20191/18/2019APEND
DetailsDave Hannah
Call to get access // Garret Phone #: ###-#### ok for temp occ ok for perm oc after elec gos perm
FIRE-Final Inspection1/16/20191/17/20191/17/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

call1st for access-Garrett Phone #: ###-####
BLD-Ceiling Grid Inspection1/9/20191/10/20191/10/2019APASS
DetailsDave Hannah
Call to get access to elevator // Garret Phone #: ###-####
BLD-Ceiling Grid Inspection12/20/201812/20/201812/20/2018PPASS
DetailsDave Hannah
Call before arrival // Garrett Phone #: ###-####
BLD-Framing/Rough-in11/20/201811/21/201811/21/2018ACANC
DetailsMike Jordan
call when there // Garrett Phone #: ###-####
BLD-Framing/Rough-in11/5/201811/6/201811/6/2018APASS
DetailsDave Hannah
Call for access // Garrett Phone #: ###-####
BLD-Framing/Rough-in10/31/201810/31/201810/31/2018PPASS
DetailsDave Hannah
Call to meet in the lobby // Garett Phone #: ###-####