BLD-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Tony Young
|
|
|
Wes Phone #: ###-####,, final ok
|
DOC - Permit Finaled | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | DONE |
Tony Young
|
|
|
Wes Phone #: ###-####/// 4.02
|
BLD-Final | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | FAIL |
Tony Young
|
|
|
Wes Phone #: ###-####,, fire caulking not complete
|
BLD-Final | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | FAIL |
Tony Young
|
|
|
Wes Flacker ###-#### wflacker@hotmail.com Phone #: ###-#### Inspection requested via web by Wesley Flacker c/n posted
|
BLD-Final | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | NH |
Tony Young
|
|
|
This house is across the street from 5807 Portsmouth inspection already scheduled for Monday. Andrina no longer works for Magellan Companies Please direct all communications to Wes Flacker ###-#### wflacker@hotmail.com Phone #: ###-#### Inspection requested via web by Wesley Flacker// // house locked,, no code,, no answer
|
BLD-Energy code compliance | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs need bolts drilled and epoxied... Do Not Cover...
|
BLD-Energy code compliance | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Energy code compliance | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis c/n items not done
|
BLD-Framing/Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | FAIL |
Brandon Shaw
|
|
|
Per plans- B6 header to be (2) 2x10 DF #2... Hold downs to be drilled and epoxied with nuts/washers... No air/foam seal...
|
BLD-Wall Bracing | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Tony Young
|
|
|
call Dennis, framer Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Footing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PART |
Jim Sly
|
|
|
Paul Phone #: ###-#### Forms up, no one on site. No string lines pulled......un- able to determine Exact setbacks. Pour at own risk.
|