BLD-Final | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Storey
|
|
|
Call 30 minutes ahead, the house is locked // Vedad Phone #: ###-####
|
DOC - Permit Finaled | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | DONE |
Jim Storey
|
|
|
VEDAD Phone #: ###-####
|
BLD-Energy code compliance | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Vedad Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Jim Storey
|
|
|
call half hour before to meet // vedad Phone #: ###-#### ele insp. allowed pannel in fire wall boxed out with gyp.
|
BLD-Framing/Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | FAIL |
Jim Storey
|
|
|
Vedad Phone #: ###-#### gyp thur floor around ele aproved pannel and at overbuild front wall.
|
BLD-Framing/Rough-in | 10/4/2018 | 10/5/2018 | 10/5/2018 | A | PART |
Jim Storey
|
|
|
Vedad Phone #: ###-#### sheer ok/ fire wall ok
|
BLD-Conference | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Jim Storey
|
|
|
Call to meet // Mia Phone #: ###-#### uplex not townhoused
|
BLD-Framing/Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | CANC |
Jim Storey
|
|
|
call to meet // mia Phone #: ###-####
|
BLD-Foundation | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Jim Storey
|
|
|
Wall // Mark Phone #: ###-####
|
BLD-Footing | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
BLD-Footing | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | FAIL |
Jim Storey
|
|
|
Mark Phone #: ###-#### not per engineering at common wall
|
BLD-Footing | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | FAIL |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Footing along existing structure not per the engineering provided. Also check rear setbck....
|