BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Sly
|
|
|
Casey Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | NR |
Brandon Shaw
|
|
|
Need Electrical rough and final... No other issues
|
FIRE-Final Inspection | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | CANC |
Troy Cobbley
|
|
|
Life safety sign off not required.
Casey Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | NR |
Jim Sly
|
|
|
Casey-please call 30 minutes prior to meet for access Phone #: ###-####
|
BLD-Wall Bracing | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Brandon Shaw
|
|
|
shear call half hour before /// Casey Phone #: ###-####
|
BLD-Conference | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Sly
|
|
|
Call // Casey Phone #: ###-####
|
BLD-Footing | 8/22/2018 | 8/22/2018 | 8/23/2018 | P | PASS |
Jim Sly
|
|
|
Casey Phone #: ###-#### Mono pour Footing and Slab
|