Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-02733
StatusFinaled
Name BERLUM DEVELOPMENT CO
Site Address 1653 N MOCKBEE PL
Project Name1653 Mockbee
Customer NumberCFH18-00072
ePlanReviewYes
Description
W.U.I. Hillside & Foothills Class A Roof Required. Permit for the construction of a new 3256 sq. ft., two story (first story 217 sq. ft., second story 2226 sq. ft. 3rd story 813 sq ft) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 1046 sq. ft. of covered patio/porch and attached garage is 1221 sq ft per the approved plans and any notations. Prescriptive Energy Compliance. R-1B zoning and setbacks per planning. ***RDP***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/7/20202/10/20202/10/2020ADONE
DetailsTony Young
James Phone #: ###-####/// prior correction ok,, c of o issued
DOC - Permit Finaled2/10/20202/10/20202/10/2020PPASS
DetailsTony Young
BLD-Final2/4/20202/5/20202/6/2020AFAIL
DetailsBrandon Shaw
R311.7.5.1 Riser- open risers... does not permit passage of a 4" sphere...
R311.7.5.2 Treads- greatest traeddepth... shall not exceed 3/8"...
BLD-Aging Inspection11/19/201911/19/201911/19/2019 DEFR
DetailsBrandon Shaw
Work in progress...
Extend Permit 90/180 days11/19/201911/19/201911/19/2019ADONE
DetailsBrandon Shaw
BLD-Framing/Rough-in7/8/20197/8/20197/8/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
OK to cover...
BLD-Energy code compliance7/3/20197/5/20197/5/2019AFAIL
DetailsBrandon Shaw
See FIR19-00321 - Do Not Cover...
BLD-Framing/Rough-in7/2/20197/2/20197/2/2019PPART
DetailsBrandon Shaw
Verify Strong Wall (North East side, Garage) anchoring...
As per walk through- fire block furred basement wall and landings...
BLD-Framing/Rough-in6/28/20197/1/20197/1/2019PFAIL
DetailsBrandon Shaw
Need Fire corrections...
No framing inspection...
BLD-Framing/Rough-in6/28/20196/28/20196/28/2019PNR
DetailsTony Young
James Phone #: ###-####,, need trades
BLD-Framing/Rough-in6/25/20196/26/20196/26/2019ANR
DetailsTony Young
James Phone #: ###-####,, needs trades 1st,, conf. walk through,, 1st part of soffits work in progress
BLD-Wall Bracing6/11/20196/11/20196/11/2019PCANC
DetailsTony Young
canceled per James // shear // James Phone #: ###-####
BLD-Wall Bracing5/3/20195/6/20195/6/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Wall Bracing2/4/20192/5/20192/5/2019APART
DetailsTony Young
STem wall // Dan Phone #: ###-####,, they are wanting a foundation,, work in progress,, I am requesting that they provide a 3rd party special inspector on site to review due to the complexity of the project
BLD-Footing1/2/20191/4/20191/4/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Arrow Tallman
BLD-Footing1/2/20191/2/20191/2/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Arrow Tallman late afternoon,, work in progress
BLD-Footing12/27/20181/2/20191/2/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Arrow Tallman
BLD-Footing12/27/201812/28/201812/31/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress
BLD-Footing12/26/201812/27/201812/27/2018ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress,, still needing public works approval
BLD-Footing12/21/201812/26/201812/26/2018PPEND
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress,, needs final soils approval from public works,,
BLD-Footing12/20/201812/21/201812/20/2018ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Arrow Tallman Inspection cancelled from web by: Arrow Tallman