Permit Information
Permit NumberBLD18-02802
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 2592 S BEVERLY ST
Project NameWest Airport Ind Park - Bldg B
Customer Number 
ePlanReviewYes
Description
(WEST AIRPORT INDUSTRIAL PARK – BLDG B – 2ND BUILDING FROM THE WEST – WAREHOUSE SHELL) (DRH18-00264 and DRH18-00332) The fire sprinkler system is used for building area increase and for fire area. To construct a new 37,182 square foot warehouse shell building (380’ x 100’ exterior dimensions). Work is to include concrete footings, concrete tilt-up wall panels, concrete floor sabs on grade, steel columns with steel baseplates and anchors, steel roof girder trusses, steel roof trusses, metal roof deck, insulation on top of the roof deck, single-ply TPO roof membrane, domed plastic skylights, wall insulation, exterior overhead doors, exterior storefront windows, exterior doors, exterior steel stairways with steel landings, two trash enclosures with steel gates, steel awnings with steel support tie-back rods, a keystone block retaining wall at the sloped grade, a 40 foot wide concrete apron at the loading dock area, and a 1-hr fire sprinkler riser room with an exterior door. Special inspection is required for soils, concrete, steel (including welding and bolting), and anchors post-installed in hardened concrete. Future roof top HVAC units weighing 750 pounds each were anticipated. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. This permit is not intended to establish a Certificate of Occupancy for any portion of this building. Separate permits are required to establish occupancy. A safe dispersal area is required on the West and on the East side of Building B because, due to excessive slopes, there will not be an accessible means of egress provided to the public way. A service sink and perhaps drinking fountains and two toilet rooms for each tenant space will be required under future tenant improvement permits. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/201910/17/201910/17/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter
DOC - Permit Finaled10/17/201910/17/201910/17/2019PPASS
DetailsMike Jordan
BLD-Final10/16/201910/16/201910/16/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter
FIRE-Final Inspection10/16/201910/16/201910/16/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Wall cover9/3/20199/3/20199/3/2019PPASS
DetailsMike Jordan
fire riser 1 hr insulation Phone #: ###-#### Inspection requested via web by Todd Landvatter. Framing at south wall is now frmed to bottom of roof deck. Ok to sheet rock.
BLD-Framing/Rough-in8/22/20198/23/20198/23/2019APART
DetailsMike Jordan
Fire riser room Phone #: ###-#### Inspection requested via web by Todd Landvatter. Needs to frame both sides of joist to roof deck, south wall. ok to one side and insulate.
BLD-Concrete7/1/20197/1/20197/1/2019PPASS
DetailsMike Jordan
2nd 1/2 pourback Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Concrete6/25/20196/27/20196/27/2019PPASS
DetailsMike Jordan
Pourback strip. 1/2 Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Concrete5/10/20195/13/20195/13/2019ACANC
DetailsMike Jordan
reinforcing wall panels. Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Concrete5/13/20195/13/20195/13/2019PPASS
DetailsMike Jordan
Concrete tilt panels 12 and 31 thru 39.
BLD-Footing4/18/20194/18/20194/18/2019PDONE
DetailsMike Jordan
concrete scheduled for 1:00PM. rebar for west and south. Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Footing4/16/20194/17/20194/17/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter. reinforcement for east and north footings ok. Work in progress on south and west exterior footings. Ok to place pending special inspection.
BLD-Concrete4/4/20194/5/20194/5/2019APASS
DetailsMike Jordan
reinforcing panels Phone #: ###-#### Inspection requested via web by Todd Landvatter. Concrete tilt panels 1 thru 30, except 12.
BLD-Concrete4/4/20194/4/20194/4/2019ANR
DetailsMike Jordan
Reinforcing wall panels (partial) Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD-Foundation1/30/20191/31/20191/31/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Slab on grade
BLD-Footing11/26/201811/27/201811/27/2018APART
DetailsMike Jordan
Ready at 9am. Phone #: ###-#### Inspection requested via web by Todd Landvatter. New mats built and placed with # 6 rebar as per approved plans. Work is still in progress. ok to place concrete pending special inspection approval.
BLD-Footing11/20/201811/26/201811/26/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter. reinforcement for interior column pad footings. Approved plans call for #6 reinforcement top and bottom mats. Contractor has constructed mats from #5 rebar.
BLD-Footing11/19/201811/21/201811/20/2018ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Todd Landvatter Inspection cancelled from web by: Todd Landvatter