BLD-Final | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Shehan
|
DOC - Permit Finaled | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Shehan. A mech permit is required for the mini split that has been installed.
|
BLD-Framing/Rough-in | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jim Sly
|
|
|
Inspection requested via web by Steven Shehan Frame and Energy.......OK
|
BLD-Wall cover | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | CANC |
Mike Jordan
|
|
|
Inspection requested via web by Steven Shehan
|
BLD-Wall Bracing | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Mike Jordan
|
|
|
Inspection requested via web by Steven Shehan. Needs to lower window in bedroom to meet egress. Will verify on framing inspection.
|
BLD-Framing/Rough-in | 9/30/2018 | 10/1/2018 | 10/1/2018 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Shehan
|
BLD-Wall cover | 9/30/2018 | 10/1/2018 | 10/1/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Shehan. Needs to renail exterior sheathing.
|
BLD-Foundation | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Mike Jordan
|
|
|
Please make every effort to be here 1pm - 2pm so we can pour after inspection Inspection requested via web by Steven Shehan
|
BLD-Footing | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Mike Jordan
|
|
|
Inspection requested via web by Steven Shehan
|