Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-02893
StatusFinaled
Name SUNRISE DEVELOPMENT LLC
Site Address 5131 N CORRALERO LN
Project NameHackberry L6B1
Customer Number 
ePlanReviewNo
Description
***Prescriptive component energy approach*** WUI Zone A requirements*** *This structure is required to have a NFPA 13D fire sprinkler system.*Permit for the construction of a new 3601 sq. ft., two story (first story 2634 sq. ft., second story 967 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 555 sq. ft. of covered patio/porch and a 890 sq. ft. attached garage per the approved plans and any notations. R-1ADA zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/22/20201/22/20201/22/2020PDONE
DetailsTony Young
Justin Phone #: ###-####
DOC - Permit Finaled1/22/20201/22/20201/22/2020PPASS
DetailsTony Young
BLD-Aging Inspection6/14/20196/14/20196/17/2019 PEND
DetailsTony Young
BLD-Aging Inspection6/13/20196/13/20196/17/2019 PEND
DetailsTony Young
BLD-Final3/28/20193/29/20193/29/2019ANR
DetailsTony Young
Justin Phone #: ###-####,, needs hand rail,,guard rails per code,, gas line protection,, firewall sealed up
BLD-Conference3/21/20193/21/20193/21/2019PPASS
DetailsTony Young
exterior step ?s,, landscape steps ok,, main access to home is the driveway
BLD-Energy code compliance1/29/20191/30/20191/30/2019APASS
DetailsTony Young
BLD-Energy code compliance1/28/20191/29/20191/29/2019AFAIL
DetailsBrandon Shaw
Need Fire Rough-in approved...
BLD-Energy code compliance1/28/20191/29/20191/29/2019ACANC
DetailsBrandon Shaw
Justion Phone #: ###-####
BLD-Energy code compliance1/28/20191/28/20191/28/2019PNR
DetailsTony Young
Justion Phone #: ###-####,, c/n posted
BLD-Framing/Rough-in1/25/20191/25/20191/25/2019PPART
DetailsTony Young
Justin Phone #: ###-####,, ok to insulate,, walked with the framer for corrections,, hangers, girder connections,, straps,, need full sprinkler pass prior to energy pass
BLD-Wall Bracing1/25/20191/25/20191/25/2019PPASS
DetailsTony Young
Justin Phone #: ###-####
BLD-Wall Bracing1/24/20191/25/20191/25/2019ACANC
DetailsJim Sly
Justin Phone #: ###-####
Canc. by Contr.
BLD-Framing/Rough-in1/24/20191/25/20191/25/2019ACANC
DetailsJim Sly
Justin Phone #: ###-####
Canc. by Contr.
BLD-Framing/Rough-in1/24/20191/24/20191/24/2019PCANC
DetailsTony Young
Justin Phone #: ###-####
BLD-Wall Bracing1/24/20191/24/20191/24/2019PCANC
DetailsTony Young
Justin Phone #: ###-####
BLD-Wall Bracing1/8/20191/8/20191/8/2019PNR
DetailsTony Young
shear // Justin Phone #: ###-####,, need portal frames
BLD-Footing10/11/201810/12/201810/12/2018APASS
DetailsTony Young
Seigo Phone #: ###-####