Permit Information
Permit NumberBLD18-02929
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2418 S TRAPPER PL
Project NameHighland HN 32-1
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - SHIFT HOUSE ON LOT AND OMIT RETAINING WALL** ***Prescriptive component energy approach***WUI Zone A requirements*** Permit for the construction of a new 3,681 sq. ft., two story (first story 1,978 sq. ft., second story 1,703 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately 272 sq. ft. of covered patio/porch and a 846 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20193/8/20193/9/2019PPASS
DetailsJim Sly
Les Phone #: ###-####
DOC - Permit Finaled3/9/20193/9/20193/9/2019PPASS
DetailsJim Sly
BLD-Energy code compliance12/13/201812/13/201812/13/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in12/10/201812/11/201812/11/2018APART
DetailsBrandon Shaw
Per plans- (2) 2x8 header needed at suite/bathroom pocket door...
Per plans- HDU5 (2) at interior shear not installed...
Missing nut and washer at hold down, right side of tall wall...
See red paint...
OK to insulate...
BLD-Energy code compliance12/10/201812/11/201812/11/2018APART
DetailsBrandon Shaw
Air/foam seal
BLD-Framing/Rough-in12/3/201812/4/201812/4/2018APASS
DetailsBrandon Shaw
Soffits...
BLD-Wall Bracing11/14/201811/14/201811/14/2018PPART
DetailsBrandon Shaw
Work in progress...
Garage PHF hold downs in place...
Tall wall and interior hold downs to be in place by framing rough-in...
BLD-Foundation9/28/20189/28/20189/28/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing9/26/20189/26/20189/26/2018PPASS
DetailsBrandon Shaw
Work in progress