BLD-Final | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 4/30/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
3.1
|
BLD-Energy code compliance | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Ceiling Grid Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffit
|
BLD-Wall Bracing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Floor to floor straps to be installed before framing rough-in...
|
BLD-Foundation | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PART |
Tony Young
|
|
|
edger Phone #: ###-####,, work in progress,, ok after adding to missed footings, tie with rebar
|
BLD-Footing | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, work in progress, ok
|