Permit Information
Permit NumberBLD18-03043
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2313 S TRAPPER PL
Project NameHN 22-1
Customer Number 
ePlanReviewYes
Description
W.U.I. Zone A. Class A Roof Required. Permit for the construction of a new 3597 sq. ft., two story (first story 1894 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 846 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20194/30/20194/30/2019APASS
DetailsDave Hannah
Les Phone #: ###-####
DOC - Permit Finaled4/30/20194/30/20194/30/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results4/30/20194/30/20194/30/2019APASS
DetailsDave Hannah
3.1
BLD-Energy code compliance1/16/20191/16/20191/16/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in1/11/20191/11/20191/11/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Ceiling Grid Inspection1/2/20191/3/20191/3/2019APASS
DetailsBrandon Shaw
Soffit
BLD-Wall Bracing12/6/201812/6/201812/6/2018PPASS
DetailsBrandon Shaw
Work in progress...
Floor to floor straps to be installed before framing rough-in...
BLD-Foundation10/19/201810/19/201810/19/2018PPART
DetailsTony Young
edger Phone #: ###-####,, work in progress,, ok after adding to missed footings, tie with rebar
BLD-Footing10/18/201810/18/201810/18/2018PPART
DetailsTony Young
Edgar Phone #: ###-####,, work in progress, ok