BLD-Final | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
DOC - Permit Finaled | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | DONE |
Jim Storey
|
|
|
Adam Phone #: ###-#### 328
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | P | PART |
Jim Storey
|
|
|
Adam Phone #: ###-#### cut out attic access at overbuilds/ pending mech.
|
BLD-Wall Bracing | 10/22/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Jim Storey
|
|
|
shear // Adam Phone #: ###-####
|
BLD-Foundation | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell wip set backs ok
|