BLD-Final | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Tony Young
|
|
|
Fire Life Safety final requested. Final Building inspection requested for late afternoon, after/during Fire Life Safety. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Final Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection complete.
Fire Life Safety final requested. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | CANC |
Tony Young
|
|
|
Greg Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | FAIL |
Jim Page
|
|
|
Mag lock access control needs to be integrated with the fire alarm system for door release under general water flow alarm. Ceiling fan on main floor needs to be integrated with the fire alarm panel to shut down on general water flow alarm per manufacture instructions. Provide emergency egress lighting for exit discharge as shown on city approved drawings. Verfiy CFM of newly installed HVAC unit, if unit moves more than 2000CFM then an in-duct smoke detector will be required for unit shutdown. Modifications to the fire alarm system requires a permit.
Greg Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Tony Young
|
|
|
Request ceiling grid inspection for cover, this afternoon. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Framing/Rough-in | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | PART |
Tony Young
|
|
|
request rough framing inspection for cover. Phone #: ###-#### Inspection requested via web by Greg Hedin,, walls ok
|