Permit Information
Permit NumberBLD18-03392
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 1208 E SHAW MOUNTAIN RD
Project NameMatt & Jill Minor Residence
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3443 sq. ft., two story (first story 2843 sq. ft., basement story 600 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 230 sq. ft. of covered patio/porch and a 1222 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. "NFPA 13D SPRINKLER SYSTEM REQUIRED"

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection. JJN

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/26/201912/27/201912/27/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ken Litzinger
DOC - Permit Finaled12/27/201912/27/201912/27/2019PPASS
DetailsDave Hannah
BLD-Grading Inspection12/19/201912/19/201912/23/2019PCANC
DetailsDave Hannah
Inspection requested via web by Ken Litzinger
BLD-Energy code compliance5/21/20195/22/20195/22/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ken Litzinger ok to sheetrock after fire sprinkler oks
BLD-Framing/Rough-in5/20/20195/20/20195/21/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ken Litzinger c/n on site ok to insulate
BLD-Wall Bracing4/9/20194/10/20194/10/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Foundation1/30/20191/30/20191/30/2019PPASS
DetailsDave Hannah
Giber Phone #: ###-####
BLD-Footing1/28/20191/28/20191/28/2019PPASS
DetailsDave Hannah
giber Phone #: ###-####
BLD-Foundation1/3/20191/4/20191/4/2019APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...
BLD-Footing12/20/201812/21/201812/21/2018APART
DetailsDave Hannah
Gibr Phone #: ###-#### basement ftgs ok to pour