Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberBLD18-03442
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 325 W IDAHO ST
Project NameSt. Luke's - Family Medical
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S – FAMILY MEDICAL RESIDENCY OF IDAHO) (CZC18-00308) The fire sprinkler system is used to substitute for 1-hr corridors and for other code trade-offs. Demolition work on the 1st story includes removing all interior walls, doors, and ceilings. Demolition work in the basement includes removing some walls, doors, and a portion of the ceiling. To remodel an existing 10,377 square foot building (8,680 square feet 1st story and 1,697 square feet basement) to be used as a medical office outpatient clinic where no one will be incapable of self-preservation. Work is to include interior nonbearing walls, 6 single-user toilet rooms on the 1st story all accessible to the disabled, interior doors, suspended acoustical ceilings, gypsum board ceilings, millwork, and finishes. The existing roof covering will be patched and repaired where needed. Structural work includes enlarged concrete footing below new steel columns that will support a new roof beam; new tube steel columns with steel base plates; a new steel beam to replace a masonry bearing wall; new wood beams supported by wood stud pack columns to replace a masonry bearing wall; a new shear wall with hold downs; additional roof joists to support new roof top HVAC units; ceiling support for new exam lights; and a new beam, columns, and footings in the basement to replace a bearing wall. Special Inspection is required for soils, concrete, steel (including welding and bolting), and for post-installed anchors in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system, including the installation of quick-response fire sprinkler heads, is required to comply with NFPA 13 and the fire alarm system (horn / strobe type) is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/12/20199/13/20199/13/2019APASS
DetailsMark Scharfen
checked extinguishers, e lighting and exit signs. passed life safety

Stan Phone #: ###-####
BLD-Final9/12/20199/13/20199/13/2019PPASS
DetailsDave Hannah
Stan Phone #: ###-####
FIRE-Conference8/27/20198/27/20198/27/2019PDONE
DetailsJim Page
Fire conference complete, discussed exit sign locations that would work for the low ceiling. Discussed needed items for life fire safety.
FIRE-Final Inspection8/27/20198/27/20198/27/2019PCANC
DetailsJim Page
Request was for a conference, not a final inspection. This request is cancelled.

Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection7/1/20197/3/20197/3/2019APASS
DetailsDave Hannah
Stan Phone #: ###-####
BLD-Energy code compliance4/29/20194/30/20194/30/2019APART
DetailsDave Hannah
Stan Phone #: ###-#### ext walls spry in insulation ok
BLD-Framing/Rough-in3/22/20193/25/20193/25/2019APART
DetailsDave Hannah
Zack Phone #: ###-#### west side ok
BLD-Framing/Rough-in2/13/20192/14/20192/14/2019APASS
DetailsDave Hannah
Zach Phone #: ###-####