BLD-Final | 7/8/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
4.5
|
BLD-Energy code compliance | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | PASS |
Dave Hannah
|
|
|
nate Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Wall Bracing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jim Sly
|
|
|
Nate Phone #: ###-#### Exterior Nailing Only.....OK
|
BLD-Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | FAIL |
Mike Jordan
|
|
|
Nate Phone #: ###-####. Contractor to provide a listed assembly to reflect the as built condition. The as built 2hr. fire wall does not match the approved plans.
|
BLD-Foundation | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 12/19/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | CANC |
Dave Hannah
|
|
|
Brandon-pour time 4:00 Phone #: ###-####
|