BLD-Final | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
DOC - Permit Finaled | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.96
|
BLD-Energy code compliance | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
BLD-Framing/Rough-in | 9/3/2019 | 9/3/2019 | 9/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
BLD-Wall Bracing | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Call ahead // Guillermo Phone #: ###-####
|
BLD-Foundation | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Jim Sly
|
|
|
Ryan Phone #: ###-####
|