Permit Information
Permit NumberBLD18-03695
StatusFinaled
Name BIG D BUILDERS
Site Address 4184 S ORCHARD ST
Project NameTurbo Air Hangar - New Bldg
Customer Number 
ePlanReviewYes
Description
(TURBO AIR HANGAR – NEW BUILDING) (3-5-20 PLAN MODIFICATION TO DELETE THE PARKING LOT WORK FROM THIS PERMIT AND TO MOVE THAT WORK TO A FUTURE PERMIT TO CONSTRUCT A SEPARATE BUILDING ON SITE. THE PARKING LOT WILL NOT BE CONSTRUCTED UNDER PHASE 1 AND WILL INSTEAD BE CONSTRUCTED UNDER PHASE 2.) (10-16-19 PLAN MODIFICATION TO CHANGE THE GAS LINE FROM A LOW-PRESSURE SYSTEM TO A 2 POUND SYSTEM INSIDE THE BUILDING WITH A REGULATOR AT EACH PIECE OF EQUIPMENT. THE MECHANICAL ENGINEER WAS CHANGED FROM CHRISTIAN GELLERT TO JARED MILLER.) The fire sprinkler system is used for building area increase, for fire area, for fire flow, and because it is an aircraft hangar. This aircraft hangar is not approved for painting operations. The hangar that was formerly at this location was relocated under permit BLD18-03446. To construct a new 29,423 square foot pre-engineered steel building to be used as a Group II aircraft hangar on property leased from the City of Boise. Work is to include concrete pier spot footings, concrete piers, concrete continuous footings, concrete stem walls, tension tie grade beams, concrete slab on grade with hairpins, steel moment frames, steel rod cross bracing, steel purlins, metal roofing, metal siding, an R-30 liner system for roof insulation, R-25 exterior wall insulation, interior toilet rooms and office, a floor above the toilet rooms and office used for mechanical equipment and served by a ladder surrounded by a guard, bi-fold hangar doors, overhead door, side-hinged swinging egress doors, interior window, exterior horizontal sliding window, and finishes. Special Inspection is required for soils, for concrete, and for steel (including welding and bolting). The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/9/20203/10/20203/10/2020PPASS
DetailsJim Storey
Mark Phone #: ###-####
FIRE-Final Inspection3/9/20203/10/20203/10/2020APASS
DetailsTroy Cobbley
Life safety passed.

Mark Phone #: ###-####
BLD-Final3/5/20203/6/20203/9/2020PCANC
DetailsJim Storey
mark Phone #: ###-####
FIRE-Final Inspection3/5/20203/6/20203/6/2020ACANC
DetailsTroy Cobbley
mark Phone #: ###-####
FIRE-Final Inspection1/8/20201/13/20201/13/2020AFAIL
DetailsTroy Cobbley
Provide plan modifications showing the actual fence/security/gate layout and the acutual fire hydrant locations. Repair the exit sign/emergency light.

mark Phone #: ###-####
BLD-Conference12/5/201912/6/201912/6/2019APASS
DetailsJim Storey
Mark Phone #: ###-####
BLD-Wall cover10/11/201910/14/201910/14/2019APASS
DetailsDave Hannah
Rick Phone #: ###-#### office and restrooms ok plywood mec deck is fire treated
BLD-Foundation9/23/20199/23/20199/23/2019PPASS
DetailsJim Storey
Rick Phone #: 20-###-####
BLD-Footing9/17/20199/17/20199/17/2019PPASS
DetailsJim Storey
Rick- please go out around 2:30 or 3pm Phone #: ###-#### south half tenton ties rebar ok
BLD-Foundation7/22/20197/22/20197/22/2019PPASS
DetailsJim Storey
RICK- rebar inspection Phone #: ###-####
BLD-Footing7/3/20197/8/20197/8/2019APART
DetailsJim Storey
Please call 30 minutes before if possible. Phone #: ###-#### Inspection requested via web by Rick Slama pad ft ok