Permit Information
Permit NumberBLD18-03779
StatusFinaled
Name CURTIS KELLAN DON
Site Address 1505 N 16TH ST
Project Name 
Customer NumberBLD18-03817 DEMO
ePlanReviewNo
Description
**PASSES UA TRADE OFF** (Ref Demo BLD18-03817) Construct new 3052 sq. ft two story single family dwelling with finished basement (first floor 1231 sq. ft., second floor 533 sq. ft., basement level 1288 sq.ft.) with 4 bedrooms, 3.5 bathrooms, approximately 50 sq. ft. of covered patio/porch and a 672 sq. ft. detached garage with 288 sq. ft. storage area above, per the approved plans and any notations. R-1CH zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20197/26/20197/26/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kellan Curtis
DOC - Permit Finaled7/26/20197/26/20197/26/2019PPASS
DetailsDave Hannah
BLD-Final7/24/20197/26/20197/26/2019ADEFR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kellan Curtis
BLD-Final7/15/20197/18/20197/18/2019ANR
DetailsJim Storey
Kellan Phone #: ###-####
BLD-Conference6/24/20196/27/20196/27/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kellan Curtis,, walk through for final,, need trades,, zoning,, hand rails
BLD-Energy code compliance4/10/20194/12/20194/12/2019APASS
DetailsTony Young
Kellan Phone #: ###-####
BLD-Framing/Rough-in4/8/20194/8/20194/8/2019PPART
DetailsTony Young
Kellan Phone #: ###-####,, seal pack,,work in progress,, ok to insulate
BLD-Framing/Rough-in4/4/20194/4/20194/4/2019PNH
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kellan Curtis// locked up
BLD-Framing/Rough-in3/28/20193/29/20193/29/2019ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kellan Curtis
BLD-Wall Bracing3/1/20193/4/20193/4/2019APASS
DetailsMike Jordan
Curtis Phone #: ###-####
BLD-Wall Bracing2/27/20193/1/20193/1/2019APART
DetailsTony Young
Curtis Phone #: ###-####,, ok to cover around windows,, need to re-do some areas
BLD-Conference1/27/20191/30/20191/30/2019PDONE
DetailsBrandon Shaw
Head hieght at stairs ok...
BLD-Foundation12/6/201812/6/201812/7/2018PPART
DetailsTony Young
Give me a call with any questions, I have concrete coming around 8am for the basement but I won''t be doing the garage till flatwork down there is done.
Phone #: ###-#### Inspection requested via web by Kellan Curtis,, heater is going on
BLD-Foundation12/3/201812/4/201812/4/2018PNR
DetailsJim Storey
The garage foundation should be good to go. Give me a call if you have any questions. Phone #: ###-#### Inspection requested via web by Kellan Curtis need heat to remove snow in forms
BLD-Foundation11/18/201811/20/201811/20/2018APART
DetailsTony Young
Concrete is scheduled for 11am, give me a call with any questions Phone #: ###-#### Inspection requested via web by Kellan Curtis,, basement walls,, work in progress
BLD-Footing11/12/201811/13/201811/13/2018PPART
DetailsTony Young
If you could give me a bit of a heads up before heading to the site that would be fantastic.
I''ll be working on the other side of town but I''d love to shoot that way and walk things through with you. Phone #: ###-#### Inspection requested via web by Kellan Curtis,, basement and garage footings,, work in progress,, ok