Permit Information
Permit NumberBLD18-03799
StatusFinaled
Name SRM CONSTRUCTION
Site Address 531 W GARFIELD ST
Project NameGarfield Apartments
Customer Number 
ePlanReviewNo
Description
(GARFIELD APARTMENTS) FIRE DAMAGE REPAIR) Permit the repair of an existing structure as the reult of fire damage with owrk to include the replacement of the roof structure, reconstruction of two carports per the attached engineering, and new electrical and mechanical systems. All work to be per the original construction documents attached. All replacement of exterior finishes are required to be consistent with the existing finishes. A preconstruction meeting with the structural inspector is required prior to any construction commencing. Smoke detectors are required. Carbon monoxide detectors are required if any there are any fuel burning appliances or attached garages. CDM.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20194/25/20194/25/2019APASS
DetailsJim Storey
Steve Phone #: ###-####
DOC - Permit Finaled4/25/20194/25/20194/25/2019PPASS
DetailsJim Storey
FIRE-Final Inspection4/24/20194/24/20194/24/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection complete.

Steve Phone #: ###-####
FIRE-Final Inspection4/22/20194/23/20194/23/2019AFAIL
DetailsJim Page
Provide fire extinguishers either for each unit under the sink in the kitchen or in the common areas, common areas need to meet the 75 foot walking distance code. Smoke detectors in 2 of the units is to close to the restrooms with showers, need a minimum of 36 inches from dorrway to smoke detector to be code compliant.

Steve Phone #: ###-####
BLD-Final4/22/20194/22/20194/22/2019PNR
DetailsJim Storey
Steve Phone #: ###-#### pending fire
BLD-Energy code compliance12/31/201812/31/201812/31/2018PPASS
DetailsJim Storey
Steve Phone #: ###-####
BLD-Framing/Rough-in12/19/201812/20/201812/20/2018APASS
DetailsJim Storey
Steve Phone #: ###-####
BLD-Framing/Rough-in12/12/201812/13/201812/13/2018ANR
DetailsJim Sly
Steve Phone #: ###-####
1 hr fire walls required between units per approved plan. install firewalls to roof deck per approved plan.
BLD-Foundation12/10/201812/10/201812/10/2018PDONE
DetailsJim Sly
Steve Phone #: ###-####
Footings.....OK
BLD-Conference10/22/201810/23/201810/23/2018APASS
DetailsJim Storey
Steve Phone #: ###-####