Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD18-03814
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 255 N 29TH ST
Project NameWhittier Community Center
Customer Number 
ePlanReviewYes
Description
(WHITTIER COMMUNITY CENTER) ""THIS IS AN EXPEDITED BOISE SCHOOLS PROJECT"" Partial demolition and renovation of the existing Whittier Elementary School to become a City of Boise Community Center. The remaining building will consist of A-3 and B areas with the B occupancy consisting of the original offices and classroom used for adult classes. The A-3 has been separated from the remainder of the building to limit the fire area and the requirement to fire sprinkler the building. All work per the approved plans and the attached engineering. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/201912/19/201912/19/2019PPASS
DetailsDave Hannah
Chase Phone #: ###-####
BLD-Aging Inspection12/11/201912/11/201912/11/2019 PEND
DetailsDave Hannah
BLD-Conference10/11/201910/11/201910/11/2019PPEND
DetailsTony Young
Chase Phone #: ###-####// wanted Dave only
BLD-Final9/26/20199/27/20199/27/2019APART
DetailsTony Young
Chase Phone #: ###-####,, temp occ. ok, ok to move in, needs to make handrails and guardrails meet min. compliance, add as needed on existing, door signage, restroom dispensaries
FIRE-Final Inspection9/23/20199/24/20199/24/2019APASS
DetailsJim Page
No fire sprinkler modifications (fire sprinklers are basement only), fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Exit signage/emergency lighting to be added in gym and exit path on level 2 (exterior exit, corridor has exit sign), added exit signs/emergency lighting to be verified during BLD final inspection. Per conversation with Ron Johnson, fire alarm system is controlled by main school fire panel, knox box for school will be utilized for this building, no other knox box required. Final life fire safety inspection for area of work complete.

will be verified on bChase Phone #: ###-####
BLD-Conference9/19/20199/20/20199/20/2019ADONE
DetailsTell Riley
Chase Phone #: ###-####//working on door hardware//new ramp complete//discussed existing doors to remain at first floor bathrooms(no changes indicated on plans)-opening widths narrow//
BLD-Framing/Rough-in7/17/20197/17/20197/17/2019PPASS
DetailsDave Hannah
Chase Phone #: ###-####
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019APASS
DetailsDave Hannah
Chase Phone #: ###-#### second floor strapes ok
BLD-Conference5/16/20195/17/20195/17/2019APASS
DetailsDave Hannah
Keith Phone #: ###-####