BLD-Final | 11/8/2018 | 11/9/2018 | 11/9/2018 | P | NR |
Jim Storey
|
|
|
Catherine Phone #: ###-####- please go as late as possible as the fire l.s. will be done early pm
|
FIRE-Final Inspection | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | FAIL |
Troy Cobbley
|
|
|
Remove or cover the exit sign at the north non-required exity door or provide ADA compliant hardware, provide a fire extinguisher as discussed and as shown on the approved plans
Catherine-please do early pm if possible as the buldg will be late pm Phone #: ###-####
|
FIRE-Final Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | FAIL |
Jim Page
|
|
|
Attempted to call point of contact 4 times with phone number provided between 11:30 to 12:30, received an immediate message that the person I am trying to call is unavailable, life fire safety inspection will need to be rescheduled.
Catherine Phone #: ###-####
|