BLD-Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | NR |
Brandon Shaw
|
|
|
Need PW appoval...
|
BLD-Blower Door Test Results | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.97
|
BLD-Other | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Energy code compliance | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Framing/Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Blower Door Test Results | 3/1/2019 | 3/1/2019 | 3/1/2019 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progess... Frost protection is required...
|
BLD-Footing | 12/25/2018 | 12/26/2018 | 12/26/2018 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | NR |
Brandon Shaw
|
|
|
Need soil sub-grade letter submitted and approved by PW...
|