BLD-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Tony Young
|
|
|
Ready for a final inspection. As per requested, handrail is installed, smoke alarm has been replaced with combo smoke/carbon monoxide detector and deck post bases are fully nailed. Phone #: ###-#### Inspection requested via web by Michael Barrie// c of o issued
|
DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | NR |
Tell Riley
|
|
|
Ready for inspection any time today. Phone #: ###-#### Inspection requested via web by Michael Barrie//need to swith smoke detector for a carbon monoxide and smoke combo//nail post bases around deck posts//add a handrail to stairs//he will call back in for re-inspection//
|
BLD-Wall cover | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 4/17/2019 | 4/18/2019 | 4/18/2019 | P | PEND |
Dave Hannah
|
|
|
Insulation and vapor barrier are ready for inspection. Phone #: ###-#### Inspection requested via web by Michael Barrie ok to cover all but for wall with mec drain line
|
BLD-Wall cover | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PART |
Tony Young
|
|
|
Any time after 9 a.m. Trades have been passed for cover. Ready for energy compliance and permission to start insulating and drywall. Phone #: ###-#### Inspection requested via web by Michael Barrie/// ok to insulate. needs mech permit and inspection
|
BLD-Conference | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####,, ok to cover soffits,, all beams, bearing have been justified
|
BLD-Conference | 2/22/2019 | 2/22/2019 | 2/23/2019 | P | PART |
Tony Young
|
|
|
conf.. on bearing
|
BLD-Conference | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PART |
Tony Young
|
|
|
Mike-would like as late as possible AM Phone #: ###-####... look at job to assess
|