BLD-Blower Door Test Results | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | DONE |
Tell Riley
|
|
|
3.2 ACH50 1701 @ 50 pa
|
BLD-Final | 7/12/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Tell Riley
|
|
|
as early as possible // Mack Phone #: ###-####
|
DOC - Permit Finaled | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/10/2019 | 7/12/2019 | 7/12/2019 | P | NR |
Tell Riley
|
|
|
Mac Phone #: ###-####//need blower door test completed and results posted//
|
BLD-Energy code compliance | 5/6/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Framing/Rough-in | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Jim Sly
|
|
|
I would like to meet you onsite if possible to review any corrections.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Wall Bracing | 4/8/2019 | 4/9/2019 | 4/10/2019 | P | PASS |
Jim Sly
|
|
|
The plans are in the job mail box and the code is 1027. we are looking for a sheer inspection so we can cover the exterior.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Footing | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Jim Sly
|
|
|
Plans are in the plan box and the code is 1027. Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|