BLD-Final | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 9/16/2019 | 9/18/2019 | 9/18/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Blower Door Test Results | 9/9/2019 | 9/9/2019 | 9/9/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4
|
BLD-Final | 9/3/2019 | 9/9/2019 | 9/9/2019 | A | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/28/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PART |
Tell Riley
|
|
|
Rudy Phone #: ###-####//nailing ok per plans// add hold downs at corner windows (Front) per plans//check at framing//
|
BLD-Foundation | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|