BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | NR |
Jim Storey
|
|
|
Failed fire final - would like a conference instead of building final // call 20 mins ahead for acess- Richard Phone #: ###-####
|
FIRE-Final Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | FAIL |
Troy Cobbley
|
|
|
Repair the existing fire sprinkler system, Provide exit path and exit signs as per the plans or re-submit, Provide emergency light at rear exit door, Provide single action hardware on the rear exit door/restroom doors/office, lower fire extinguishers to no more than 5' in height.
after 10 am please- Richard Phone #: ###-####
|
FIRE-Final Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | CANC |
Jim Page
|
|
|
Inspection request will need to be rescheduled, could not gain access at time that inspection could be performed, point of contact is going to reschedule inspection request, this request is cancelled.
Call 20 mins for access- Richard Phone #: ###-####
|
BLD-Final | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | CANC |
Jim Storey
|
|
|
Call 20 mins for access- Richard Phone #: ###-####
|