Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD19-00128
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 300 E MALLARD DR Unit: STE 300
Project NameApex Manufacturing Solutions
Customer Number 
ePlanReviewYes
Description
(APEX MANUFACTURING SOLUTIONS OFFICE TI) Permit to combine the existing 2,072 sq ft Suite 300 & 3,670 sq ft Suite 375 into one suite for an office tenant. Work to include: demolition of interior, nonbearing partition walls; upgrading all third floor sprinkler heads to quick response heads and downgrading the corridor to a non-rated corridor; new partition walls and doors; new plumbing for break room sink; modification of the existing suspended ceiling; relocation of existing light fixtures and HVAC supplies/diffusers; and interior finishes in compliance with Ch. 8 of the 2015 IBC. Two code modification approval letters have been uploaded to the permit. This building is fully Fire Sprinklered for 1-hour substitution with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20194/8/20194/8/2019APASS
DetailsJim Storey
Tom Phone #: ###-####
FIRE-Final Inspection4/2/20194/3/20194/3/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
BLD-Ceiling Grid Inspection3/25/20193/25/20193/25/2019PPASS
DetailsBrandon Shaw
BLD-Ceiling Grid Inspection3/22/20193/22/20193/22/2019PNR
DetailsBrandon Shaw
Tom Phone #: ###-####
BLD-Framing/Rough-in2/21/20192/21/20192/21/2019PPASS
DetailsJim Storey
Tom Phone #: ###-####