BLD-Final | 6/10/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Tell Riley
|
|
|
Added closer to med gas closet.
Thanks, Drew Moorhouse McCarter-Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse//closer was added to fire door//project complete per plans.//
|
FIRE-Final Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Drew Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Final | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Tell Riley
|
|
|
I would like to meet you onsite if available. Phone #: ###-#### Inspection requested via web by Drew Moorhouse// add auto closer to med gas room per plans.
|
FIRE-Final Inspection | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | PART |
Troy Cobbley
|
|
|
A temp for life safety is ok until the required NFPA Medical Gas Signage has been provided on the Medical Gas Room door.
Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Framing/Rough-in | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Jim Sly
|
|
|
We are looking for our framing inspection to begin sheetrock. The lock box is 1027 and is located on the bike rack on the front of the building. Please call me if you have any issues. I am happy to meet you onsite as well to help with access to the project.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|