Permit Information
Permit NumberBLD19-00536
StatusUnder Review
Name ESI
Site Address 11972 W FAIRVIEW AVE
Project NameVillage East - Clubhouse
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (CLUBHOUSE – VILLAGE EAST APARTMENTS) (PUD18-00042) (DRH18-00528) (8-4-20 PLAN MODIFICATION TO CONVERT A PREVIOUSLY PROPOSED TOILET ROOM INTENDED TO SERVE THE SWIMMING POOL AT THE CLUBHOUSE INTO A DOG WASH ROOM (BLD19-00536). THE CLASS C SWIMMING POOL WILL BE SERVED BY ONLY ONE SINGLE-USER UNI-SEX TOILET ROOM ACCESSED DIRECTLY FROM THE FENCED POOL AREA AND POTENTIALLY BY THE SEPARATE SEX TOILET ROOMS LOCATED WITHIN THE CLUBHOUSE. THE 2015 INTERNATIONAL SWIMMING POOL AND SPA CODE DOES NOT REQUIRE TOILET ROOM FACILITIES FOR CLASS C SWIMMING POOLS. AN EXTERIOR DOOR WILL BE RELOCATED AND AN EXTERIOR WINDOW WILL BE INSTALLED. VENTILATION LOUVERS FOR THE POOL EQUIPMENT ROOM WILL ALSO BE PROVIDED.) This building does not have a fire sprinkler system. To construct a 6,753 square foot clubhouse building to serve an apartment complex. Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with R-10 perimeter slab edge insulation, 2x6 wood stud exterior walls with R-20 cavity insulation, wood columns, shear walls with structural wood panels and hold downs, interior nonbearing walls, interior doors, interior windows, 4 toilet rooms accessible to the disabled, a natural gas fireplace, outside natural gas fire tables with occupant sensors, a mail room with individual mail boxes, a 1-hr pool equipment room, draftstops in the attic, engineered wood truss roof system with a structural wood panel roof deck and R-38 insulation installed on top of the ceiling with the attic vented to the outside, exterior windows, exterior doors, exterior cementitious lap siding, exterior brick veneer, exterior stucco, asphalt shingles, interior millwork, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. A separate permit is required for the swimming pool. The barrier around the swimming pool is required to be part of the work covered under that permit. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance5/12/20205/12/20205/12/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Travis Blackburn//main area ok//do not cover back bathroom or pool heater room//
BLD-Framing/Rough-in5/6/20205/7/20205/7/2020APASS
DetailsTell Riley
Approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate, pool room area not yet approved by mechanical//
BLD-Framing/Rough-in5/6/20205/6/20205/6/2020PPART
DetailsTell Riley
Finish framing inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//Truss corrections made from previous day, othr 1/2 trusses checked, minor nailing corrections//will check other framing tomorrow//
BLD-Framing/Rough-in5/4/20205/5/20205/6/2020PPART
DetailsTell Riley
Inspection to allow insulation install. Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts as discussed, fix holddowns, 1/2 trusses were looked at, some corrections required, will check at next inspection//
BLD-Wall Bracing5/5/20205/5/20205/6/2020PPASS
DetailsTell Riley
most shear corrections made, some hardware will be addressed during framing inspeciton//
BLD-Framing/Rough-in2/19/20202/20/20202/20/2020APART
DetailsTell Riley
Mail room only for prerock Phone #: ###-#### Inspection requested via web by Travis Blackburn//pre-rock areas ok to cover//fix hold down bolt prior to cover//
BLD-Wall Bracing12/17/201912/18/201912/18/2019PFAIL
DetailsTell Riley
Shear inspection on clubhouse Phone #: ###-#### Inspection requested via web by Travis Blackburn//walked clubhouse with Ben--he has corrections noted on tablet onsite--holdowns issues, anchor bolt issues, nailing at sill plate and blocking in one area//
BLD-Concrete10/9/201910/14/201910/14/2019PPASS
DetailsTell Riley
This is for the slab for our clubhouse. The pour actually takes place on Tuesday 10/15/19 at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//vapor barrier ok//no bar for slab//specials will test concrete at time of pour///
BLD-Foundation9/16/20199/16/20199/16/2019PPASS
DetailsTell Riley
This is a reinspection for reinforcement at corners. Pour time is at 2 pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//working on clearances on bar while onsite//corrections made from previous inspection//ok pending specials//
BLD-Foundation9/10/20199/12/20199/12/2019PFAIL
DetailsMike Jordan
Concrete pour is at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn. Missing vertical reinforcement in corners. Need RFI for repair.
BLD-Footing9/5/20199/6/20199/6/2019PPASS
DetailsTell Riley
Concrete is scheduled for 1pm to pour these footings Phone #: ###-#### Inspection requested via web by Travis Blackburn//pending specials//ok to pour//