Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD19-00637
StatusFinaled
Name KNIGHT CONSTRUCTION LLC
Site Address 2141 W AIRPORT WAY Unit: 900
Project NameCardinal Health USP 797
Customer Number 
ePlanReviewYes
Description
(CARDINAL HEALTH) **5/8/2019 PLAN MODIFICATION TO REVISE THE RESTROOM LAYOUT SHOWN ON THE FLOORPLAN** *SPECIAL INSPECTIONS* required per the attached Form #310 for the post-installed concrete anchors for the laboratory panel system. Permit is for the construction of a clean room within an existing 2,079 sq. ft. pharmacy that was permitted under BLD00-00342 by Syncor International Corporation. Work is to include a new accessible restroom, new prefabricated laboratory panel walls, new non-bearing interior partitions, new accessible doors, laboratory equipment, new suspended ceiling, electrical, mechanical, plumbing, and finishes in compliance with Ch. 8 of the 2015 IBC. There is an existing 1-hour tenant wall noted on the drawings. NOTE: This building is fully fire sprinklered for area increase. Racking or storage that exceeds 8 ft. in height requires a separate Building Permit. Any alterations or modifications to the building’s Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/13/20196/13/20196/13/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joseph knight
BLD-Final6/13/20196/13/20196/13/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joseph knight
FIRE-Final Inspection6/13/20196/13/20196/13/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
BLD-Framing/Rough-in6/12/20196/12/20196/12/2019PPASS
DetailsJim Storey
Have revised set og plans showing no changes to the bathroom. Building closes at 3pm Phone #: ###-#### Inspection requested via web by Joseph knight final ok pending fire.
FIRE-Final Inspection6/12/20196/12/20196/12/2019PCANC
DetailsJim Page
Inspection request will be rescheduled to coincide with fire sprinkler inspection. This request is cancelled per conversation with point of contact.

Joe Phone #: ###-####
BLD-Ceiling Grid Inspection5/2/20195/3/20195/3/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joseph knight
BLD-Framing/Rough-in4/28/20194/29/20194/29/2019APART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Joseph knight
Inspection of Curb on roof for HVAC.....OK to cover.