BLD-Final | 9/23/2019 | 9/24/2019 | 9/25/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications per this scope, no fire alarm modifications, per this scope, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for scope of work complete, signature not provided due to no signature card.
TOM Phone #: ###-####
|
BLD-Other | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
fire proofing // Tom Phone #: ###-####
|
FIRE-Final Inspection | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | CANC |
Mark Scharfen
|
|
|
Wrong permit called in. Fire safeing, not life safety. Cancelled.
Tom Phone #: ###-####
|
BLD-Foundation | 4/24/2019 | 4/25/2019 | 4/26/2019 | A | PASS |
Dave Hannah
|
|
|
rebar // Tom Phone #: ###-#### floor infill at stairs ok
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/25/2019 | P | PART |
Dave Hannah
|
|
|
Tom- shaft wall inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, upper 2' extension ok to cover,, ?s on shaft design,, needs to be per UL listing,, or get a fix from architect
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|