Permit NumberBLD19-01163
StatusFinaled
Name SCHNEIDER CUSTOM HOMES
Site Address 3156 N LANCASTER PL
Project Name3156 N Lancaster Place
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2,254 sq. ft., two story (garage and mechanical room basement level, all living upper level) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 522 sq. ft. of covered patio/porch and a 1,279-sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJNA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final. SPRINKLERS ARE REQUIRED. LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other3/4/20203/5/20203/5/2020APASS
DetailsTony Young
Dillion Phone #: ###-####// 415 to nominate for energy award
DOC - Permit Finaled3/5/20203/5/20203/5/2020PPASS
DetailsTony Young
BLD-Final3/4/20203/4/20203/4/2020PPASS
DetailsTony Young
Dillion Phone #: ###-####
BLD-Blower Door Test Results3/4/20203/4/20203/4/2020PPASS
DetailsTony Young
Dillion Phone #: ###-####// 1,6
BLD-Final3/2/20203/4/20203/4/2020APASS
DetailsTony Young
Dillon Phone #: ###-####
BLD-Final2/28/20203/2/20203/2/2020PPART
DetailsTony Young
Dillon Phone #: ###-####,, walk through,, needs hillside pass,, handrail finished,, fire seperation sealed,, cable railing letter of ok from the engineer
BLD-Energy code compliance11/20/201911/21/201911/21/2019APASS
DetailsTony Young
Dillon Phone #: ###-####
BLD-Energy code compliance11/20/201911/20/201911/20/2019PNR
DetailsTony Young
Dillon Phone #: ###-####,, needs plumbing, fire sprinklers prior to cover
BLD-Framing/Rough-in11/7/201911/8/201911/8/2019PPART
DetailsTony Young
Dillon Phone #: ###-####,, walls ok to insulate,, needs fire sprinklers and plumbing pass prior to energy code inspection,, insulation will be used for fireblocking
BLD-Framing/Rough-in11/5/201911/7/201911/8/2019PDEFR
DetailsTony Young
Dillon Phone #: ###-####
BLD-Wall cover11/4/201911/5/201911/5/2019APART
DetailsTony Young
soffits work in progress,, ok after ele rough in
BLD-Conference11/4/201911/4/201911/4/2019PPART
DetailsTony Young
Dillon Phone #: ###-####,, ok to do the base layer of foam in the attic
BLD-Wall Bracing10/7/201910/8/201910/8/2019APASS
DetailsTony Young
Dillon Phone #: ###-####
BLD-Wall Bracing10/4/201910/7/201910/7/2019ANR
DetailsTony Young
Dillon Phone #: ###-####,, re-do
BLD-Footing9/4/20199/5/20199/5/2019APART
DetailsTony Young
Andy Phone #: ###-####,, footings on the west side of the house,,
BLD-Wall Bracing8/30/20198/30/20198/30/2019PPEND
DetailsTony Young
ready by noon // Andy Phone #: ###-####,, 3:23,, already poured footings
BLD-Foundation8/26/20198/26/20198/26/2019PPASS
DetailsTony Young
wall // Andy Phone #: ###-####
BLD-Footing8/21/20198/22/20198/22/2019APART
DetailsTony Young
Andy Phone #: ###-####,, upper house footings
BLD-Footing8/20/20198/21/20198/21/2019ANR
DetailsTony Young
Andy Phone #: ###-####,, needs soils approval 1st
BLD-Footing8/19/20198/20/20198/20/2019PNR
DetailsTony Young
Andy Phone #: ###-####
BLD-Foundation7/15/20197/16/20197/16/2019APART
DetailsTony Young
Andy Phone #: ###-####,, garage walls ok,,
BLD-Footing7/3/20197/8/20197/8/2019APASS
DetailsMike Jordan
Andy Phone #: ###-####. Garage footings only ok for concrete.
BLD-Footing7/2/20197/3/20197/3/2019PNR
DetailsTony Young
Andy Phone #: ###-####,, work in progress,,