Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD19-01389
StatusFinaled
Name COASTAL CONSTRUCTION AND LUMBER COM
Site Address 11241 W GABRIELLE DR
Project NameGalahad Townhouses Seveplex
Customer NumberBLD19-01374, 01389 - 01394
ePlanReview 
Description
**PASSES USING UA TRADE OFF** (SEVEN PERMIT IN EPLAN UNDER BLD19-01374)Permit for the construction of a new 1171 sq. ft., two story (first story 550 sq. ft., second story 621 sq. ft.) single family dwelling with 2 bedrooms, 2.5 bathrooms, approximately 39 sq. ft. of covered patio/porch per the approved plans and any notations. C-2 D/DA zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201911/5/201911/5/2019PPASS
DetailsMike Jordan
Kenny Phone #: ###-####
DOC - Permit Finaled11/5/201911/5/201911/5/2019PPASS
DetailsMike Jordan
BLD-Blower Door Test Results11/5/201911/5/201911/5/2019PDONE
DetailsMike Jordan
4.2
BLD-Final11/4/201911/4/201911/4/2019PFAIL
DetailsMike Jordan
Kenny Phone #: ###-####.
BLD-Energy code compliance8/27/20198/28/20198/28/2019APASS
DetailsMike Jordan
Kenney Phone #: ###-####
BLD-Energy code compliance8/23/20198/26/20198/26/2019APASS
DetailsMike Jordan
Kenny Phone #: ###-####
BLD-Framing/Rough-in8/26/20198/26/20198/26/2019APASS
DetailsMike Jordan
Kenny Phone #: ###-####
BLD-Framing/Rough-in8/21/20198/22/20198/22/2019ACANC
DetailsMike Jordan
kenny Phone #: ###-####
BLD-Framing/Rough-in8/21/20198/22/20198/22/2019APART
DetailsMike Jordan
Kenny Phone #: ###-####. Remove electrical wires through property line wall, remove pnetrating items in lay down parapet and complete sheet rock to soffits. ok to insulate.
BLD-Wall Bracing8/12/20198/12/20198/12/2019PPASS
DetailsMike Jordan
shear // Kenny Phone #: ###-####
BLD-Wall Bracing7/17/20197/18/20197/18/2019APASS
DetailsMike Jordan
fire wall // Kenny Phone #: ###-####. 1st floor 1hr. walls ok.
BLD-Energy code compliance7/16/20197/16/20197/16/2019PCANC
DetailsMike Jordan
Kenny Phone #: ###-####. Insulation for 1hr walls and anchors for shear.
BLD-Other7/11/20197/12/20197/12/2019APASS
DetailsMike Jordan
fire wall // Kenny Phone #: ###-####. Interior face layer of 5/8 type x rock for 1hr. walls ok.
BLD-Foundation7/1/20197/2/20197/2/2019PPART
DetailsMike Jordan
Kenny-slab on grad rebar Phone #: ###-####
BLD-Concrete7/1/20197/2/20197/2/2019PPART
DetailsMike Jordan
Brandon Phone #: ###-####. Interior thickend footings.
BLD-Foundation6/13/20196/14/20196/14/2019PCANC
DetailsMike Jordan
Kenney- insulation foundation slab on grade Phone #: ###-####
BLD-Energy code compliance6/14/20196/14/20196/14/2019PPASS
DetailsMike Jordan
Kenney- insulation foundation slab on grade Phone #: ###-####. Rigid insulation on interior side of stemwall under slab on grade.
BLD-Foundation6/12/20196/13/20196/13/2019APASS
DetailsMike Jordan
Dane Phone #: ###-####