Permit Information
Permit NumberBLD19-01705
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 816 W BANNOCK ST
Project Name4th Floor Unit Relocation
Customer Number 
ePlanReviewYes
Description
(GARRO BUILDING - HVAC RELOCATION) ** This building is fire sprinklered to allow the 5th floor. Permit is for modifications to the HVAC system on the 4th floor of the existing historic building that totals approximately 5,900 square feet. Work to include relocation and enclosure of existing heat pump units. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. NO OCCUPANCY TO REMODELED TENANT SPACE IS ALLOWED UNDER THIS PERMIT. Relocated or future tenants must apply for building permit and receive a certificate of occupancy prior to occupying any portion of the 4th floor. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/19/20198/19/20198/19/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Dustin Keyes
FIRE-Final Inspection8/19/20198/19/20198/19/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire exitnguisher is placed with a current inspection tag, ceiling tile on southeast side to be installed before BLD final. Final life fire safety inspection for area of work complete.

Plans are on the 4th Floor now Phone #: ###-#### Inspection requested via web by Dustin Keyes
BLD-Final8/19/20198/19/20198/19/2019ACANC
DetailsDave Hannah
Plans are on the 4th Floor now Phone #: ###-#### >> Inspection requested via web by Dustin Keyes Inspection cancelled from web by: Dustin Keyes
BLD-Final8/15/20198/16/20198/16/2019PNR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Dustin Keyes needs fire final first
FIRE-Final Inspection8/15/20198/16/20198/16/2019AFAIL
DetailsMark Scharfen
plans not on site. Contractor did not return call.

Phone #: ###-#### Inspection requested via web by Dustin Keyes
BLD-Framing/Rough-in8/5/20198/5/20198/5/2019APASS
DetailsDave Hannah
Need inspection on soffit framing on around mechanical units. Once this is approved we will install gyp on wood framing and gyp on soffits. Phone #: ###-#### Inspection requested via web by Dustin Keyes