BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Keyes
|
FIRE-Final Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire exitnguisher is placed with a current inspection tag, ceiling tile on southeast side to be installed before BLD final. Final life fire safety inspection for area of work complete.
Plans are on the 4th Floor now Phone #: ###-#### Inspection requested via web by Dustin Keyes
|
BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | A | CANC |
Dave Hannah
|
|
|
Plans are on the 4th Floor now Phone #: ###-#### >> Inspection requested via web by Dustin Keyes Inspection cancelled from web by: Dustin Keyes
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Keyes needs fire final first
|
FIRE-Final Inspection | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | FAIL |
Mark Scharfen
|
|
|
plans not on site. Contractor did not return call.
Phone #: ###-#### Inspection requested via web by Dustin Keyes
|
BLD-Framing/Rough-in | 8/5/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Dave Hannah
|
|
|
Need inspection on soffit framing on around mechanical units. Once this is approved we will install gyp on wood framing and gyp on soffits. Phone #: ###-#### Inspection requested via web by Dustin Keyes
|