Permit Information
Permit NumberBLD19-01748
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 1487 S BOULDER VIEW LN
Project Name63-1 WSV1
Customer NumberGATE CITY
ePlanReviewYes
Description
**WUI FOOTHILLS ZONE A** **PASSES USING UA TRADE OFF** Permit for the construction of a new 2425 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 371 sq. ft. of covered patio/porch and a 981 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ****A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.***** SPRINKLERS ARE NOT REQUIRED. LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/10/20204/13/20204/13/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled4/13/20204/13/20204/13/2020PPASS
DetailsTell Riley
BLD-Blower Door Test Results4/10/20204/13/20204/13/2020ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Clint Wall//4.09 ACH 50//
BLD-Energy code compliance2/4/20202/10/20202/10/2020APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in2/4/20202/6/20202/6/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other1/13/20201/13/20201/13/2020PPASS
DetailsBrandon Shaw
Soffit
BLD-Wall Bracing1/13/20201/13/20201/13/2020PPASS
DetailsBrandon Shaw
jorge Phone #: ###-####
BLD-Foundation10/22/201910/23/201910/23/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing10/17/201910/18/201910/18/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation10/13/201910/14/201910/14/2019ACANC
DetailsBrandon Shaw
Wall will be ready to inspect at 11 o’clock , concrete is schedule for 1 o’clock pour . Phone #: ###-#### Inspection requested via web by Edgar Sanchez